Laserfiche WebLink
Hockey Board Preventative Maintenance 60 FTE Labor Hours estimated; 2 FTEs required Low Priority. <br />This work will include pressure washing and sealing the boards with a clear sealer at Hazelnut Park. This <br />project can be completed by volunteers with the assistance of FTE's. The Hazelnut Park hockey rink is <br />highlighted below. <br />1 <br />17 <br />t <br />a <br />a <br />,[ <br />Freeway Park and Perry Park Hockey Rink Condition Evaluation 10 FTE Labor Hours estimated; 1 FTEs <br />required Medium Priority. <br />The hockey boards are approaching the end of useful life, evaluate the condition of the hockey rink <br />elements (boards, fencing, posts, gravel, grading, etc.) and prepare recommendations for rehabilitation <br />project. *** NOTE- this evaluation should be complete by June 1 for budgeting.*** <br />Play Structure Inspections and Wood Fiber/Mulch Maintenance 160 FTE Labor Hours estimated; 2 FTEs <br />required High Priority. <br />This work will be completed based on the spring playground inspection measurements of mulch depth. <br />Monthly play structure inspections are completed during the spring, summer, and fall months. During <br />inspections, damaged or vandalized equipment will be replaced, and the structure is checked for overall <br />safety. Arden Oaks and Freeway Parks will have mulch replaced as part of the improvement project in <br />2025. <br />A full replacement of the play structure fiber mulch is scheduled for every 10 years as a guideline. <br />Valentine Park is proposed for 2025. 120 FTE Labor Hours estimated; 3 FTEs required Medium Priority. <br />The map below outlines all play structures citywide. <br />14 <br />