My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 02-28-1983
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1980-1989
>
1983
>
CC 02-28-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:12:17 PM
Creation date
11/10/2006 2:38:26 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />" <br /> <br />. <br /> <br />. <br /> <br />. ~ <br /> <br />It is proposed to be an urban section with concrete curb <br />and gutter, storm sewer system, bituminous roadway. All areas <br />that are disturbed with construction will be topsoiled and <br />sodded. I believe those are the major features of the project. <br /> <br />In the course of the project, we have specifically asked, <br />through a proposed agreement with the City, that 75% of the <br />cost of the concrete curb and gutter, except those needed for <br />medians, that are constructed within the City, be paid for by <br />the City, that any storm water contribution from outside the <br />roadway which creates an additional cost to the storm sewer <br />system being constructed in the roadway, be participated in by <br />the municipality. In the case of Arden Hills, I believe that <br />that would be pretty much limited to the very south end of <br />the project, south of Victoria. <br /> <br />As the County ~oad and bridge budget for detached path <br />construction is limited to $20,000 for the year 1983, we have <br />proposed that that limit be assigned to this project.and the <br />remaining cost be split evenly between the community of Arden <br />Hills and 5horeview. Upon completion of the construction, <br />the path system will be the ownership and operation of the <br />community - that is, the County wishes to see the paths con- <br />structed for pedestrian facilities off the roadway - but we <br />don't have ordinances and things that govern that type of <br />facilities. Also, the storm sewer system, when completed - ~ <br />the County will maintain the catch basins and leads - that is, <br />the part that physically drains the roadway- and the trunk <br />line sewer which carries the main body of the water or which <br />may be extended into other areas in the future will become <br />the property and responsibility of the City. i believe, <br />your Honor, that that takes care of it. <br /> <br />MAYOR WOODBURN: We'll be able to come back to any <br />questions. At this time we'll ask Mr. Popovich to explain <br />any financing that may be required. <br /> <br />MR. POPOVICH: Mayor and members of the Council, the <br />County is expecting the City to participate by paying 75% <br />of the cost of the concrete curb and gutter and part of the <br />cost of the bituminous walkway. When you break those costs <br />down, as the engineer has, it's $34,500 for the curb and <br />gutter and $7,700 for the walkway. You're expected to get <br />the right~f-way and easements, which is estimated to be <br />another $10,000 and then a share of the storm drainage <br />facility is estimated at $5,000. That totals $57,200. <br />There's a percentage added for contingency, legal - it's a <br />contingency matter - of $8,800. 50 the total estimated cost <br />is $66,000. <br /> <br />While this is proceeding under a local improvement code, <br />so that if the Council decided to assess, you could do so. <br />Whether you want to or not depends on -as you well know - <br /> <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.