<br />.". <br />< <br /> Minutes of Regular Council Meeting, October 13, 1986 <br /> Page 3 <br /> Hicks moved to delete the item #4 from the original motion and add that the <br /> Attorney obtain the necessary easements prior to Engineer advertising for bids <br /> for the improvements. Sather seconded the motion. Amendment to the motion <br /> carried unanimously. (4-0) <br /> Original motion carried unanimously. (4-0) <br /> REPORT OF VILLAGE ENGINEER DONALD CHRISTOFFERSEN <br /> Status Report - New BriRhton Interceptor <br />. Engineer advised most of the information regarding status of sewer interceptor <br /> was previously stated under Status of Easements. <br /> Bid Award for Elevated Water StoraRe Tank <br /> Engineer reviewed the bids received for the two types of storage tanks (fluted <br /> pillar and pedestal spheroid) and for the two capacities (I million and 1.5 <br /> million gallons). Christoffersen recommended Council award the bid to <br /> Hydrostorage for the 1 minion gallon capacity, fluted pillar tank in the <br /> amount of $792,200.00: <br /> Hicks asked if the 1 million gallon tank would be sufficient for any future <br /> development in Arden Hills. <br /> Christoffersen stated that since the Arsenal had not expressed any interest in <br /> service from the water tank, the 1 million gallon tank would serve any future <br /> development in the City. <br /> Hansen asked if there were any bids received from local contractors. <br /> Engineer advised there are no contractors in Minnesota who build water storage <br /> tanks. <br /> There was discussion regarding painting the Ardem Hills logo on the tank. <br /> Engineer advised this was omitted from the bid to keep costs lower and in the <br /> past Councils have'directed not to .identifytower. <br /> Sather asked if this matter could be held until full Council was present to <br /> vote on an expenditure of this magnitude. Contractor hopes to complete <br /> foundations this fall, a two week delay might preclude this. <br /> Moved by Hicks, seconded by Hansen, that Council award contract to Hydrostorage <br /> for a Fluted Pillar, One Million Gallon Capacity Elevated Water Storage Tank, <br /> in the amount of $792,200.00. Motion carried. (3-1) (Hicks, Hansen, Woodburn <br /> voting in favor, Sather in opposition) <br /> REPORT OF VILLAGE PLANNER ORLYN MILLER <br /> Case No. 86-32, Setback Variance for GaraRe Construction, 1369 Forest Lane, <br /> Marlvs Nixon <br /> Council was referred to Board of Appeals Minutes 9-25-86 and Planning <br /> Commission Minutes of 10-1-86, both recommending approval of the Variance <br /> request. <br />. Miller reviewed his report of 9-23-86 and displayed a drawing of the proposed <br /> garage addition. <br /> Councilmember Hansen reviewed the Planning Commission discussion and concerns <br /> regarding this application. <br /> Hansen moved, seconded by Sather, that Council approve the 10 ft. Setback <br /> Variance for Garage Construction, 1369 Forest Lane, Marlys Nixon, as submitted. <br /> Motion carried unanimously. (4-0) <br /> Case No. 86-33, Minor SubdiviSion/Lot Split and Front Lot Width Variance, 2026 <br /> Stowe Avenue, Viola Stone <br /> Council was referred to Board of Appeals Minutes 9-25-86 and Planning <br /> Commission Minutes of 10-1-86, both recommending approval of the Variance <br /> request. <br />