Laserfiche WebLink
<br />Minutes of Regular Council Meeting, July 14 <br />Page 5 <br /> <br />In review of the site plan, Mike Rich indicated the location of a 20' wide <br />sanitary sewer easement along the west portion of the site, beyond which <br />parking and truck maneuvering area is provided, with landscaping on the west of <br />the site. Rich explained that Robert Pugleasa Company handles dock equipment <br />and accessories; has 5 service vehicles of their own and have from 8 to 10 <br />deliveries per week via vans, pick-ups, and an occasional semi-truck. <br /> <br />. <br /> <br />A model and colored slides of the proposed structure were shown. Rich <br />described the exterior treatment of the office portion to be of face brick at <br />the lower level with pre-finished metal panel above; described the warehouse <br />portion to be of pre-finished metal architectural panels above a concrete base. <br />Rich explained that the two dock areas (west side of building) are not needed <br />for this facility, are for display purposes. Rich explained that the <br />architectural panel is galvanized steel; carries a lifetime warranty without <br />any color fading, chipping, or checking and can be heavily insulated for high <br />energy efficiency and is almost maintenance-free. Rich described the fenced <br />storage area to be of chain link with aluminum slats of the same color as the <br />building. <br /> <br />In discussion, the applicants were asked to address the concern of the Planning <br />Commission relative to the proposed exterior treatment rather than decorative <br />concrete block. Rich said the proposed metal panel is not an inexpensive <br />treatment; it will retain its color and character without maintenance and <br />"concrete block will not. Rich displayed samples of the two panels (dark brown <br />and bisque in color); noted both are embossed steel; laminated with acrylic <br />film; explained it can be insulated with an 8" bat of insulation material which <br />provides two to three times greater insulation than a concrete block building. <br /> <br />The future addition was queried. Rich said it is their intent to, at some <br />future date, extend the warehouse to the north at the same 5' setback from east <br />side of the property; future addition is anticipated to be 60' x 80' (4,800 <br />square feet). Rich said only the 15' variance would be extended; no other <br />variances would be needed for the future addition. <br /> <br />Concern was expressed relative to the fence slats. Rich explained that <br />aluminum slats are durable; vinyl slats are less expensive and less durable; <br />noted that the owner's maintenance policy is the key to the upkeep of the <br />facility, including the fenced area. Pugleasa said he keeps his facility in <br />"tip top" shape; invited Council to visit his present 50-year-old building and <br />fenced area; explained they invite their customers to look at their equipment; <br />property will look like new every day. Pugleasa said their trucks will be <br />stored inside the building at night - boom truck is their tallest with a 12' <br />high boom; highest part of building is 22' from grade. <br /> <br />After discussion, Hicks moved, seconded by Hansen, that Council approve the <br />site plan with the 15' sideyard setback variance on the east, the basis for the <br />variance is that the adjacent property is not adversely affected, and allows <br />for parking on the west side and more useful use of the site; approval of the <br />building permit is subject to exterior of warehouse to be of decorative masonry <br />material. <br /> <br />. <br /> <br />In discussion, Hicks expressed his concern that the building be compatible to <br />other buildings in this primarily commercial area along County Road E. Rich <br />noted that the MSI building is substantially metal panel; explained that this <br />is the finish the applicant desires; wants the building exterior to be <br />maintenance-free and the building energy efficient; noted the metal panel is <br />the preference of the owner. Rich said it will provide an outstanding <br />appearance and urged reconsideration of this condition in the motion. <br /> <br />Pugleasa said masonry buildings break up and crack; this panel is <br />maintenance-free which is what he wants, and also provides better insulation <br />capability. Pugleasa said he's investigated the various exterior materials and <br />this looks better to him - will look better longer than block. <br /> <br />Some concern was expressed relative to the long, uninterrupted, west wall of <br />the warehouse, which appears to be not very interesting with no space to <br />landscape. Pugleasa said concrete block is not an alternative; noted that this <br />material also is preferable to concrete because of its water tightness. <br />