Laserfiche WebLink
<br /> I <br /> 2. Receipt of title to the MnDOT parcel by the applicant; I <br /> 3. Approval of the grading, drainage, and erosion control plan by the Rice Creek .. <br /> Watershed District; <br /> 4. Issuance ofa General Construction Storm Water Permit from the MPCA; <br /> 5. Issuance of the necessary wetland fill exemptions and/or permits from the 1 <br /> necessary local, state, and federal agencies; <br /> 6. The smallest amount of bare ground is exposed for as short as time as feasible; <br /> 7. Temporary ground cover, such as mulch, is used and permanent ground cover, I <br /> such as sod, is established; <br /> 8. Methods to prevent erosion and trap sediments are employed; <br /> 9. Fill is stabilized to accepted engineering standards, approved by the city engineer; I <br /> 10. Modification of the landscape materials to provide for acceptable plant materials; <br /> 11. Provision of the necessary amount of landscape materials; <br /> 12. No fuel storage or overnight truck storage is permitted; I <br /> 13. Provision of a conservation easement over that portion of the site lying outside of <br /> the grading limits on the lake side of the site; <br /> 14. Integration of brick or stone in the building entrances; and I <br /> 15. Modification of the west building wall to include windows, color, architectural <br /> relief and articulation similar to the north wall. <br /> D. Updates. The applicant has modified several portions of their plan per the direction of I <br /> the Planning Commission's recommendation, The modifications made relate to eI <br /> conditions; 1,3,4,5,10,11,14, and 15. <br /> 1. Condition #1. The applicant has modified the access point such that it is I <br /> consistent with the recommendations of the Planning Commission and Staff. <br /> 2. Condition #3. The RCWD approved the grading, drainage, and erosion control I <br /> plan at their August 28, 1996 meeting, <br /> . <br /> 3, Condition #4. The applicant has received the necessary permit from the MPCA. I <br /> 4. Condition #5. The RCWD approved the proposed wetland modifications at their <br /> August 28, 1996 meeting. I <br /> 5. Condition #10. The applicant has modified the landscape plan such that the plan <br /> contains acceptable plant materials. I <br /> 6. Condition #11. The applicant has modified the landscape plan to quantify the I <br /> plant materials that are proposed to be saved. The required landscaping for the <br /> 154,237 square foot building can be summarized as follows: <br /> I <br /> .. <br /> I <br />