My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-25-1996
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1996
>
CCP 11-25-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:03 PM
Creation date
11/10/2006 3:12:59 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> I <br /> The Public Works Superintendent along with City Accountant, Terry Post are working on a study I <br /> for replacing the Commercial/Industrial water meters. el <br /> Infratec Inc. has assured Public Works Staff they will be doing the TV inspection of <br /> approximately 20,000 feet of the sewer system in December, to meet requirements for the MCES <br /> $10,000.00 Grant. I <br /> The Public Works Superintendent and Mr. Post have heenlooking at new technology for <br /> monitoring the Arden Hills lift stations and water system, called SCADA (Supervisory Control I <br /> and Data Acquisition), this technology would eliminate the need for seventeen dedicated phone <br /> lines and a visit to each facility everyday. <br /> Also, the need for Electro Watchman would be eliminated as the SCADA system automatically I <br /> pages the person on call, and Informs the person as to which facility and the nature of the <br /> problem. I <br /> I <br /> I <br /> .. <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> .. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.