My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-25-1996
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1996
>
CCP 11-25-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:03 PM
Creation date
11/10/2006 3:12:59 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> -qzy . <br /> Memotandum - Narrative . <br /> August I, 1996 <br /> Page Two -. <br /> KKENo.96-08-1I59-01 <br /> The master plan and design of the development is phased, with the Arby's restautant to begin construction . <br /> as soon as possible following city apptovals. The limits of construction for Phase I would include new <br /> parking in front of the existing building that allows immediate access from Gtey Fox Road. (See site plan . <br /> for limits of construction). Future phases would be constructed as the market dictates. The architectural <br /> design intention is fot uniformity in development. The first phase, Arby's, utilities materials that will set <br /> the tone for future design On the site. The brick base is a brick to match the existing warehouse brick. . <br /> Neutral E.I.F.S. colots allow for future flexibility in design and lightens the palette. The pylon signs are <br /> designed to incorporate the same materials of brick and E.I.F.S; thus, strengthening the uniformity. A <br /> material sample board has been included fot review. <br /> Current B-3 zoning on this site allows for three pylon signs due to the two street frontages and multiple . <br /> buildings. Through the P .U.D. process, we are proposing two pylon signs of a higher height (24' and <br /> square footage (130 sq. ft.) The fewer number of pylons should present a less cluttered front image, and . <br /> the increased square footage allows for flexibility of unkno\m future tenants, yet is under the current <br /> zoning maximum of three signs at 100 sq. ft. per sign (300 sq. ft.) Due to the constraints of the location of <br /> the existing building, limited access points, and the need for anticipation of future retail development, the . <br /> car stacking in the drive-through lane is limited to 12 cars. The drive lane is located as deep into the site as <br /> possible in order to ptevent congestion on public streets. Parking provided for the restaurant is at 56 cars <br /> which exceeds the B-3 zoning requirement of 49 cars by seven stalls, and should help to ease the stacking eI <br /> situation. Landscaping and lighting are designed to provide a uniform appearance between Shannon <br /> Square and this retail development. The property is owned by St. Paul Properties, Inc., and maintenance <br /> and management is provided by Madison Marquette. Through the P.U.D. process, we hope to . <br /> accommodate the city requirements for retail development, while allowing for flexibility and negotiation fot <br /> future retail development as the market dictates. <br /> . <br /> skt <br /> . <br /> . <br /> . <br /> . <br /> . <br /> . <br /> .. <br /> . <br /> I <br /> , <br />
The URL can be used to link to this page
Your browser does not support the video tag.