My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-24-25-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
11-24-25-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2025 1:33:59 PM
Creation date
11/21/2025 1:32:01 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall be compensated under one of the following fee structures. The applicable structure will be <br />determined by the Contractor based on the status and complexity of each permit and invoiced within <br />ninety (90) days of the assignment: <br />(1) Hourly Rate Structure: The Contractor may invoice at $95.00 per hour for time spent on the <br />permit. Billable activities include, but are not limited to: <br />(a) Reviewing permit records and project history to assess scope and status <br />(b) Conducting site inspections (including travel time within Jurisdiction limits) <br />(c) Performing administrative tasks related to the continuation or closure of the permit <br />(2) Percentage -Based Fee Structure: If the Contractor determines that a full or partial plan review <br />is required, the Contractor shall be authorized to invoice the Jurisdiction up to 80% of the <br />standard Plan Review Fee and 80% of the applicable Permit Fee, as identified in the adopted fee <br />schedule. <br />ii. Once the Contractor has been compensated under either structure, the Contractor shall be responsible <br />for all subsequent inspections and documentation through project completion. <br />3. Designated Building Official Services. In the event that the Jurisdiction requires the Contractor to serve as <br />the Designated Building Official — such as due to the departure or extended absence of existing staff — the <br />following terms shall apply: <br />A. The Contractor shall provide Building Official services, including plan review and required inspections, <br />in accordance with the Minnesota State Building Code. <br />B. Compensation for these services shall follow the same structure as project -specific permits which shall <br />be calculated based on the adopted fee schedule: <br />i. 80% of the standard Plan Review Fee <br />ii. 80% of the applicable Permit Fee <br />C. This designation shall be made by City Council appointment and confirmed in writing by both parties. <br />Additional duties or scope beyond normal plan review and inspection may be defined and compensated <br />through a separate addendum or task order, if required. <br />4. The Contractor shall retain 100% of the following fees collected by the Jurisdiction, where applicable: <br />i. Investigation <br />ii. Reinspections <br />iii. Repetitive plan reviews <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.