My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCP 04-06-2005
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2005
>
PCP 04-06-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:22 PM
Creation date
11/10/2006 3:56:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 4. Was the hardship created by the owner? <br /> (NO) The lot was platted long before the City's current size standards and setback . <br /> regulations. Any construction on this site of a reasonable structure would result in the <br /> need for a variance of some kind. <br /> 5. Wonld granting the variance alter the essential character ofthe neighborhood? <br /> (NO) The new house would enhance the character of the neighborhood by removing a <br /> substandard structure and replacing it with an attractive modern home. Several of the <br /> properties in the surrounding area are closer to the front or side yard property lines than <br /> the City's standard setbacks would otherwise allow. <br /> Recommendation <br /> In Planning Case #05-11, staff recommends that the request for a 10- foot Side Yard setback <br /> variance and a 5-foot Front Yard setback variance be approved to allow for the construction of a <br /> new home on the property at 1137 Edgewater Avenue subject to the following conditions: <br /> 1. The applicant shall file all necessary building permits with the Building Official for <br /> approval prior to the issuance of a building permit. Building permit plans shall be <br /> submitted to the Building Official a minimum of two (2) weeks before the planned start <br /> of construction. e <br /> 2. A drainage swale should be constructed along the western portion of the property to <br /> collect the drainage water flowing westward down the hill of the property and carry the <br /> drainage toward the street. A revised grading and drainage plan showing this drainage <br /> swale shall require the approval of the Arden Hills City Engineer prior to the issuance of <br /> any building permits. <br /> 3. A revised grading and drainage plan showing the elevation ofthe first floor and basement <br /> and the surrounding property shall be submitted to the City and shall require approval by <br /> the City Engineer prior to the issuance of any building permits. <br /> 4. The applicant shall be required to plat the property prior to the issuance of any building <br /> permits. <br /> Plan Review Comments <br /> A. Building Permit Plans shall be submitted to the Building Official a minimum of two (2) <br /> weeks before the planned start of construction. <br /> B. No construction shall begin before plans are approved by the City of Arden Hills' <br /> Building Official. <br /> C. Appropriate sediment and erosion controls shall be installed prior to any construction <br /> activity to insure that any sediment disturbed during construction shall maintain on the <br /> applicant's property and not affect the neighboring properties. <br /> \\EarthIPlanningIPlanning Cases12005\05-11 Karjalahti Variance (PENDING)\04-06-05 PC Report Karjalahti Variance. doc e <br /> Page 60f7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.