<br /> I <br /> I . sewer, the realignment of watermain, the construction of storm drainage ponding and piping, <br /> I street and trail improvements, and boulevard landscaping. The total estimated cost for these <br /> improvements is up to $1,743,400 for construction, in addition to a 5% construction contingency <br /> I and a 32 % overhead cost to cover engineering services, financing, legal fees, and City <br /> administration. This results in a total project cost of up to $2,416,400. It is anticipated that the <br /> project can be initiated in late summer of 1997 and completed by mid-summer of 1998. <br /> . <br /> I <br /> I <br /> I <br /> . <br /> .- <br /> I <br /> . <br /> . <br /> I <br /> I <br /> . <br /> . <br /> Ie <br /> I -12- <br /> FEAS-520.089 520-089.10 <br />