Laserfiche WebLink
<br />. <br />-' <br />.. . <br />. <br />.- GATEWAY BUSINESS DISTRICT <br />-. Estimated Storm Sewer Costs <br />I Storm Sewer and Pond Construction <br />. Unit Extended <br /> Construction Item Quantity .\Jnit ~ ~ <br />I Property Acquistion 1 LS $ 70,000.00 $ 70,000 <br /> Pond Excavation 8,000 CY $ 4.00 $ 32,000 <br /> 2' x 3' Catch Basin 19 EA $ 1,100.00 $ 20,900 <br />. Standard Manhole 10 EA $ 1,600.00 $ 16,000 <br /> Large Diam. Manhole 7 EA $ 2,800.00 $ 19,600 <br /> 15" RCP Storm Sewer 1,350 LF $ 22.00 $ 29,700 <br /> 18" RCP Storm Sewer 1,200 LF $ 24.00 $ 28,800 <br />. 24" RCP Storm Sewer 900 LF $ 28.00 $ 25,200 <br /> 27" RCP Storm Sewer 600 LF $ 33.00 $ 19,800 <br />.. 30" RCP Storm Sewer 400 LF $ 37.00 $ 14,800 <br /> 18" RCP FES 1 EA $ 500.00 $ 500 <br /> 30" RCP FES 1 EA $ 1,700.00 $ 1,700 <br /> Storm Sewer Jacking 1 LS $ 45,000.00 $ 45,000 <br />. Ditch Grading 1,000 CY $ 7.00 $ 7,000 <br /> Class III Rip Rap 20 CY $ 50.00 $ 1,000 <br /> Outlet Control Structure 1 EA $ 2,500.00 $ 2,500 <br />I Restoration 5 AC $ 1,500.00 $ 7,500 <br /> Estimated Storm Sewer Construction Cost $ 342,000 <br />. 5% Contingency Cost $ 17,100 <br /> 32% Overhead Cost $ 114,912 <br />. Estimated Storm Sewer Project Cost $ 474,012 <br />. <br />. <br />. <br />.e <br />I <br />