Laserfiche WebLink
<br /> -- <br /> - <br /> Ie Removal oflock-out / tag-out shall only be done by the employee who has installed the lock-out / <br /> I tag-out device and only after notifying all other employees working on the equipment/machine! <br /> building that he/she is removing the device. <br /> I The last employee working on the equipment/machinelbuilding shall be responsible for removing <br /> the group lock-out / tag-out device. <br /> I O1,rtside contractors will be required to follow all OSHA requirements relative to lock-out / tag-out <br /> procedures. It will be the city's responsibility to make sure the outside contractor follows these <br /> I procedures. <br /> I <br /> I <br /> I <br /> Ie <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> , 3 <br /> I <br />