My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCP 06-07-2006
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2006
>
PCP 06-07-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:58 PM
Creation date
11/10/2006 4:07:09 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ARDEN HILLS PLANNING COMMISSION - MAY 3, 2006 3 <br />. eastern (front) lot line to 40 feet extending west from the eastern lot line <br /> shall be deemed the front yard for Lots 2 and 3. <br /> 10. The applicant shall suhmit an easemcnt agreement that grants pennanent <br /> access to the right-of-way across Outlot A for Lots I, 2, 3, and 4. The <br /> easement shaH be subject to approval by the City Attorney and filed with <br /> Ramsey County with the final plat <br /> 11. The applicant shall submit an approved road access permit from Ramsey <br /> County before the final plat is approved. <br /> 12. The dliveway shall be at least 20 feet wide anclii'l@ fcct clear in height as <br /> required by the Fire Marshal. ..J'" " <br /> 13. The applicant shall deposit into an cscroj!\;fa@'ffi."unt or submit a bond with <br /> the City Administrator a sum equal tAji~oncn~~r?d twenty-five percent <br /> (125%) of the estimated cost of. tYt", road, "l!fJ)ity, and stormwater <br /> management improvcments to be constructed withinthesubdivision. The <br /> required improvements shall be installed and compJ",ti;d in accordance <br /> with the plans and specifications prepared by the applica'rtt.al1d'subject to <br /> approval by the City Engineer:1l1dyity Planner. The escro\'{or bond shall <br /> be returned upon completion ofth,,:project and final inspection and <br /> 14. approval from theCity Engineer.....: <br /> The applicant shiIlI..obtain any required "pcrnlits from the Rice Creek <br /> Watershed and supplylh",C:ity with a cop)',before any building permits <br /> are issued..:". .," ~:;":;!mm1f::;:: <br /> 15. Any changes to the gr~din5ii;j6t"~~W~I()t:\"s()ntrol plan shall be subject to <br />. approvalby the City Engin"er. "",!: <br /> 16, The applicant shall provide an as-bunt survey upon completion of thc <br /> project <br /> 17. Tl1eapplicant shall comply Vi.ith applicable provisions of the City Code <br /> andt.elatedordinances. <br /> Commiss'i6herJ:;arson asked what hardship was involved with not putting in a City street <br /> with a cul-dc-sac."jMr. Lchnoff responded the applicant indicated the topography would <br /> be difficult for a cli1:.d'e-sac, andthc cul-de-sac would require more space. <br /> .. <br /> Commissioner Modesette asked if the water service to Lot I would be reused. Mr. <br /> Lehnhoff'responded Lot I and Lot 4 would retain their existing water & sewer <br /> connections:, <br /> Commissioner.Modesette asked if the rctaining wall would remain, or would it be rebuilt <br /> Mr. Lchnoff stated he believed the existing wall would remain, but applicant was here to <br /> respond to this question specifically. <br /> Commissioner Modesette asked if the City Engineer had looked at the pond to ensure it <br /> had enough capacity for the additional nmoff from this proposed development Mr. <br /> Lehnhoff responded the City Engineer had reviewed the drainage plan. He indicated the <br /> Rice Creek Watershed District would need to approve ofthis also, <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.