<br /> I <br /> 3. Snow storage easement required on the north side of Gateway Boulevard (plan I <br /> -. <br /> Sheet C3.0). The six foot shift of the road bed of Gateway Boulevard to the north causes <br /> the boulevard of that right-of-way to be reduced by six feet. Therefore, an expanded (by <br /> six feet) drainage and utility easement adjacent to the north right-of-way line of Gateway <br /> Boulevard is required to replicate what was lost with the shift of the roadbed. . <br /> 4. Dedication of Gateway Boulevard(plan Sheet C3.0 & final plat). The final plat shows <br /> Gateway Boulevard as Outlot A. The developer needs to transfer ownership of this outlot <br /> to the City. I <br /> 5. Buildings are shifted slightly to the east (Plan Sheet C4,O). The buildings (Phases II, <br /> III, and IV) have been shifted slightly to the east with the revised grading that was done. <br /> The relationships of the buildings to each other and their respective required setbacks I <br /> have been maintained. - <br /> 6. Relocated ponds from Phases III and IV. As a part of the grading revisions that have <br /> been provided on the site. The two ponds on Phase III and the pond in front of the Phase I <br /> IV building are being proposed to be relocated to the City pond on the Naegele property <br /> at the south corner of Round Lake Road and 13th Street (under the NSP transmission I <br /> lines). The easements for this pond have not yet been obtained, but are required for this <br /> development. <br /> 7. Site Plan states 10 foot sign setback when 20 feet is required (Plan Sheet C3.0). The I <br /> site plan states that the required sign setback from the right-of-way is ten (10) feet when <br /> twenty (20). feet is required. As a note, the building plans show the signs with a twenty <br /> (20) foot setback. ~ <br /> 8. The west driveway onto Gateway Boulevard from Phase II was eliminated (plan <br /> Sheet C1.Z). The increase in the height of the site required the elimination of the <br /> driveway from the southwest corner of Phase II to Gateway Boulevard. The . <br /> employee/customer parking lot has two points of access one from Gateway Boulevard <br /> and one from Round Lake Court. <br /> 9. lZ" watermain is required on phase II (8" proposed) to replace existing lZ" . <br /> watermain which is being relocated (Plan Sheet C6.0 & C3.Z). The existing 12 inch <br /> watermain which is currently located in 14th Street is being relocated to Gateway <br /> Boulevard. However, the Phase I building is serviced off of this line. Therefore, the I <br /> water line through Phase II should also be a 12 inch line to ensure proper water flow. If <br /> the applicant can show that Phase I can safely operate on an 8 inch line, then the 8 inch . <br /> line could remain. <br /> 10. Building Elevation modifications to Phases III and IV (Plan Sheet A-3.3). The Staff <br /> has previously provided the City Council (August worksession) with the proposed I <br /> enhancements to the exterior of Phases III and IV. The only modifications that have been <br /> done since then is to step the wing wall to enhance its aesthetic qualities. <br /> 11. Landscape is required behind and front of Phase 3 and Phase 4 (Plan Sheet Ll.0 & I <br /> CZ.3 & Ll.3 & Ll.4). The revised grading which is being proposed raises the buildings <br /> relative to the properties around the site. Previously, the applicant described how the <br /> buildings would be effectively screened from Round Lake because of the elevation of the I <br /> ground between the lake and the property, but by raising the site and the buildings the <br /> effectiveness of this screen has been minimized. The two buildings will be above the -. <br /> ground level of the land between the buildings and the lake. However, there will be <br /> . <br />