Laserfiche WebLink
<br /> I <br /> ~ CITY OF ARDEN HILLS <br /> 1450 WEST HIGHWAY 96 <br /> ARDEN HILLS, MN 55112-5794 <br /> I October 10,1997 <br /> I Exhibit B <br /> I The following is a list of items needed to be repaired at 1369 Forest Lane. This letter <br /> may not be all inclusive and is subject to final approval by the Building Official. <br /> I 1. Any structural members damaged or charred more than ten percent of their <br /> original statc. <br /> I 2. All roofing materials damaged are to be brought up to their original condition, <br /> including but not limited to: sheathing, underlayment, ice and water shield, and <br /> shingles. <br /> , All flooring materials damaged or significantly weakened by fire or water are to <br /> I .). <br /> be replaced to current code, including sub floor, flooring, and carpet. <br /> 4. All wall and ceiling coverings damaged by smoke, fire, and water are to be <br /> -: removed and replaced with materials meeting today's code. <br /> 5. All insulation damaged by water, fire, smoke, are to be removed and replaced <br /> with insulation maximizing it's efficiency. <br /> I 6. All ventilation of the roof system is to be repaired and brought up to today's <br /> code. <br /> 7. All windows, doors, millwork, damaged by water, smoke, and fire, shall be <br /> I replaced or repaired to local standards. <br /> 8. The entire electrical system shall be inspected by a licensed electrician and any <br /> I repairs necessary to bring it up to current state code shall be done. <br /> 9. The entire plumbing system shall be inspected by a licensed plumber and any <br /> repairs necessary to bring it up to current state code shall be done. <br /> I 10. The entire heating system shall be inspected by a licensed heating contractor and <br /> any repairs necessary to bring it up to current state code shall be done. <br /> 11. All permits and licenses necessary to complete the above work shall be obtained <br /> I within 45 days from the date of the notice and order attached. <br /> 12. All work is subject to inspection by the City and final approval to the <br /> satisfaction of the Building Official <br /> I 13. Work is to be started within 60 days of the date of this order and completed <br /> within 90 days after that time when work is commenced. <br /> I <br /> I' <br /> I PHONE: 16121 633-5676 . FAX 16121 633-7839 <br />