My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-10-1997
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1997
>
CCP 11-10-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:04 PM
Creation date
11/10/2006 4:07:34 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> CITY OF ARDEN HILLS <br /> . MEMORANDUM <br /> DATE: November 6, 1997 <br /> TO: Brian Fritsinger, City Administrator <br /> I <br /> ') tV <br /> FROM: Cindy S. Walsh, Parks and Recreation Director"---'s, <br /> SUBJECT: Cummings Park Wash-out Repair Final Pay Estimate <br /> Contract Change <br /> Glenn Rehbein Excavating Inc. was the low bidder for the project at $30,905. When I met with <br /> the Project Coordinator, we discussed substituting erosion controlling sod in lieu of rip rap for <br /> the top portion of the washed out area. Rehbein has a turf specialist who recommended the use <br /> of a product called "Stay-Turf'. This product was developed in Australia and has a plastic mesh <br /> grown into the sod. Rehbein has used it on a number of athletic facilities as well as drainage <br /> areas. The original design called for placing rip rap over the entire hillside. Mr. Stonehouse <br /> concurred with my proposed change from using all rip rap to substituting stay-turf on the top of <br /> the portion of the hill. <br /> This change resulted in a deduction of $3,500 from the original contract price. <br /> -. FEMA FundinQ: Assisstance <br /> - I am anticipating the reimbursement of $4,284 from the Federal Emergency Management <br /> Agency before the end of the year. <br /> - <br /> - Recommendation <br /> - The project has been satisfactorily completed for $27,405. I recommend that the entire project <br /> cost of$27,405 be paid to Glenn Rehbein Excavating Inc. <br /> . <br /> - Please contact me prior to the Council Meeting if you have any questions. I will be attending the <br /> i Tony Schmidt Task Force meeting on November 10 so I will not be in attendance at the Council <br /> I meeting. <br /> I <br /> I <br /> I <br /> I. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.