My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCP 10-04-2006
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2006
>
PCP 10-04-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:17 PM
Creation date
11/10/2006 4:12:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ARDEN HILLS PLANNING COMMISSION -SEPTEMBER 6, 2006 3 <br /> > <br /> I. The applicant shall comply with applicable provisions of the City Code and related <br /> . ordinances. <br /> 2. The applicant shall submit the final plat and application to the City of Arden Hills <br /> within three months of the preliminary plat approval date or the approval shall expire <br /> unless an extension is granted by the Planning Commission. The final plat shall <br /> reflect all applicable changes in the conditions of approval for the preliminary plat. <br /> 3. The project shall be completed in accordance with the plans submitted as part of the <br /> preliminary plat and final plat applications. Any significant changes to these plans, as <br /> detcrmined by the City Planner, shall require review and approval by the Planning <br /> Commission. <br /> 4. The applicant shall include a 12-foot drainage and utility easement centered on all <br /> common lot lines, and a 12- foot drainage and utility easement along the right-of-way. <br /> 5. The applicant shall pay a park dedication fee as determined by the City Council at the <br /> time the final plat is approved. <br /> 6. The applicant shall amend the final plat to be in conformance with all of the <br /> comments from the August 28'\ 2006, memo from the City Engineer. <br /> 7. Any extension of City services for the new lot shall be subject to review and approval <br /> by the City Engineer and all associated costs shall be the responsibility of the <br /> applicant. <br /> 8. Erosion control measures shall be installed before any grading or construction begins <br /> and shall be maintained and remain in place until groundcover is reestablished and <br /> construction is finished. <br /> 9. Any changes to the grading or erosion control plan shall be subject to approval by the <br /> . City Engineer. <br /> 10. Lot I shall use Lake Johanna Blvd as the official access point to the property. <br /> 11. The applicant shall submit an approved road access permit for Lots I and 2 from <br /> Ramsey COlmty before the final plat is approved. <br /> 12. The applicant shall obtain all necessary permits, including the wetland fill permit, <br /> from Rice Creek Watershed District before the final plat is approved. <br /> 13. The applicant shall be responsible for obtaining all other necessary permits from <br /> Ramsey County, the State of Minnesota Department of Natural Resources and any <br /> other governing agencies where applicable prior to approving the final plat. <br /> Chair Sand opened the public hearing at 7:27 p.m. <br /> Chair Sand invited anyone for or against the request to come forward and make <br /> comment. <br /> Steve Nelson, 3475 Siems Court, stated he was not for or against this. He stated he had <br /> lived down the road from this property for 20 years. He noted this was the lowest point <br /> in the entire neighborhood and he was concerned if they filled this in it would flood the <br /> neighboring properties. He asked where the water would go if this was filled in. He did <br /> not believe there was sufficient pondage in this area. He asked the City to think this <br /> development through to ensure there was sufficient pondage. <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.