My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-18-03 PTRC Minutes
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Minutes (1999 to Present)
>
1999-2009
>
2003
>
11-18-03 PTRC Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:20 PM
Creation date
11/10/2006 4:29:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Arden Hills Parks, Trails and Recreation Committee Meeting Miuutes <br /> November 18,2003 <br /> Page 3 of5 <br /> . 4. PARKS AND RECREATION UPDATES <br /> Tom Moore - Park and Recreation Update <br /> Mr. Moore provided the Committee with an update on the Park activities. He reviewed the <br /> following items: <br /> . He encouraged Committee Members to visit Perry Park. A lot more work has been done <br /> including drainage and berm work. The blacktop has to be redone. He asked that the <br /> Committee Members look at the hill behind the existing play structure. The park shelter <br /> will be placed in that location. <br /> . He indicated a trail connection from lower Swamp Lake Road to the park shelter could be <br /> constructed in-house. <br /> . Staff will also be putting in a water fountain at Perry Park from a water stub that was <br /> previously installed. <br /> 5. CUMMINGS PARK FACILITY UPDATE <br /> . Mr. Moore provided the Committee with an update on the progress for the Cummings Park <br /> facility. He reviewed the following issues with the Committee: <br /> . Staff obtained a bid from movers to move the cxisting Cummings Park warming house. <br /> The bid was in the amount of $4,500. The warming house could be moved to Freeway <br /> Park or Valentine Park. At Valentine Park the warming house would be placed right next <br /> to the blacktop of the basketball court. <br /> Committee Member Henry stated he does not believe the City can take the play structure down at <br /> Valentine Park without a plan to replace the existing structure. <br /> Mr. Moore advised staff could time the removal so the play structure is only down during tile <br /> winter months. If the structure is taken down November 1,2004, the PTRC could go to the <br /> Council with a recommendation in August to replace it in spring, 2005. <br /> . He encouraged Committee Members to visit Cummings Park. The building is up and is <br /> beautiful. The cost is well over $350,000. Staff believes that with the trails the cost will <br /> be over $500,000. He asked Committee Members to contact him with any comments or <br /> concerns after visiting the park. <br /> . The Wyncrest area expressed concern regarding hockey boards at Cummings Park. The <br /> . staging area is very torn up and staff does not believe hockey boards will go up this year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.