<br /> - " <br />Memorandum, New City Hall Report . <br />Page Two <br />August 31, 1998 <br />Facilities Design/Revised Project Costs <br />Once the space needs study was completed, the architect began working on a preliminary design <br />that was presented to the City Council in late 1997, and presented to the community as part of the <br />1998 Town Hall meeting, The design was well received by the public and City Council. <br />At the same time, the schematic plans were being drafted, the architect prepared an initial project <br />cost estimate for the construction of the facility, In March, 1998, this was as follows: <br /> . Main Floor 9,283 square feet <br /> . Second Floor 2,538 square feet (wlfinished) <br /> . Basement 4,284 square feet (unfinished) <br /> Total Square Feet 16,105 <br />The estimated cost of construction at this time was as follows: <br /> . Cost of Construction $2, I 00, 13 5 plus alternates/fixtures <br />Beginning with the 1998 Retreat, the City Council discussed thc design layout and budget on <br />several occasions, As a result of the internal reorganization of staff, the internal layout design . <br />was the only significant change made to the program, These revised plans were last reviewed by <br />the City Council at its June 15, 1998 Worksession, and no significant changes were made to the <br />plan, With the additional adjustments to the internal layout, the size of the facility has been <br />revised as follows: <br /> . Main Floor 8,712 square feet <br /> . Second Floor 2,180 square feet (finished) <br /> . Basement 4,210 square feet (unfinished) <br /> Total Square Feet 15,102 <br />The construction budget is essentially the same as in March at $2,151,913, Other expenditures <br />that are not included in these estimates are: <br /> . Stone Exterior (alternate) $ 51,802 <br /> . F urni ture/F ixtures 325,000 <br /> . Cable System 125,000 <br /> . Phone System 70,000 <br /> . Additional Landscaping 37.000 <br /> Total Estimated Project Cost $2,760,715 <br />Clearly, total proposed project cost has increased significantly ($990,715; 56%) over the 1996 <br />RFP not to exceed cap of$I,770,000, Council may wish to provide staff with direction on the . <br />level of current proposed project cost. <br />