Laserfiche WebLink
<br />.. <br /> Department Head Report <br /> Page 3 <br />. <br /> 0 Readied warming houses for winter. <br /> 0 Painted some of the picnic tables. <br /> 0 Installed mower and equipment tie downs on transport trailer. <br /> Public Works Director <br /> Some of the things currently being worked on by the Public Works Director include: <br /> 0 Corresponding with licensed Arden Hills waste haulers attempting to standardize <br /> collection days. <br /> 0 Working with Public Safety Commission on Emergency Preparedness Plan. <br /> 0 1999 Street Improvement Project. <br /> 0 Ordered new generator approved by Council. <br /> 0 Monitoring current street projects. <br />. <br /> 0 Working with residents of Chatham area to resolve MediaOne cable construction <br /> complaints. <br /> 0 Working with developer on Hanson Property on Shoreline Lane south of Edgewater. <br /> 0 Preparing documents to get additional $5,000. In grant monies from MCES this year for <br /> Inflow/Infiltration Identification. <br /> 0 Continued ditch evaluation with BRW. <br /> Ditch evaluation should be completed in November and Council can expect a report on our <br /> findings. <br />. <br />