My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-19-1999
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1999
>
CCP 07-19-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:15:30 PM
Creation date
11/13/2006 11:22:47 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'. <br /> <br />City" of Arden Hills <br /> <br />Chapter 10 Utilities <br /> <br />I' <br />~ <br />I <br />I <br />I <br />I <br />I <br />I <br />-- <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />" <br />I <br /> <br />underground installation of utilities have been made. It shall be the responsibility of <br /> <br />the developer and all contracts on the construction to keep utility easements free and <br /> <br />clear, to the end that the utility company shall have access at all times for installation <br /> <br />and maintenance of its utilities. <br /> <br />Subd. 4 Existing Distribution Lines. It shall be the policy of the City to pursue the <br /> <br /> <br />objective of eventually having all utility distribution lines underground. It is recognized, <br /> <br />however, that existing overhead utility lines represent a substantial economic investment for <br /> <br />the benefit of the public and that it is generally not feasible or desirable to replace existing <br /> <br />serviceable facilities with underground lines or to require that the normal periodic <br /> <br />extensions of existing overhead systems be installed underground without imposing an <br /> <br />undue burden on the public and the utility involved. Any utility company replacing or <br /> <br />making extensions to existing overhead distribution facilities in any area in which the repairs <br /> <br />or extensions cover more than twelve hundred (1200) feet of line shall submit its plans to <br /> <br />the utility committee at least thirty (30) days prior to the replacement, alteration or <br /> <br />installation. <br /> <br />Subd. 5 Excavation. In order to avoid possible damage to underground utilities, no person <br /> <br />shall excavate in any easement or right-of-way containing underground utilities without fIfst <br /> <br />notifying the central notification center as required by Chapter 216D of the State Statutes; <br /> <br />provided however, the excavation shall not constitute a breach of this Section unless the <br /> <br />excavator has actual notice of the existence of the utilities or unless the easement has been <br /> <br />.10 - 47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.