My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-25-1999
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1999
>
CCP 10-25-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:15:42 PM
Creation date
11/13/2006 11:27:01 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />ARDEN HILLS CITY COUNCIL - OCTOBER 12, 1999 <br /> <br />5 <br /> <br />. <br /> <br />work completed through September 30,1999. BRW and City staff have conducted a walk <br />through inspection ofthe project and have provided a final punch list of items for the Contractor <br />to complete. <br /> <br />Mr. Brown advised that the City Engineer recommends approval of payment request #6 in the <br />amount of $30,698.44 to Forest Lake Contracting. A retainage of 5 percent is being held for the <br />proj ect. <br /> <br />Mayor Probst asked if the project would be completed under budget. Mr. Brown stated that, <br />although there was some additional work to be completed, he did anticipate the project being <br />completed approximately $20,000 to $30,000 under budget. <br /> <br />MOTION: <br /> <br />Councilmember Malone moved and Councilmember Larson seconded a motion to <br />approve payment request #6 in the amount of$30,698.44 to Forest Lake <br />Contracting. The motion carried unanimously (5-0). <br /> <br />C. Payment Request #1, McClung Drive/Arden Manor Park, Nadeau Utility, Inc. <br /> <br />. <br /> <br />Mr. Brown explained that the City Council had before it pay request #1 for Nadeau Utility, Inc. <br />for the McClung Drive/Arden Manor Park project. The pay request represented work <br />accomplished primarily at Arden Manor Park. The work accomplished thus far had been good. <br />The City Engineer had some concerns about Nadeau Utility, Inc., however, the Contractor has <br />proven to be diligent. <br /> <br />Grading work at Arden Manor Park has been substantially completed and the basketball court <br />surfacing was scheduled to occur October 7, 1999. The contractor has constructed the concrete <br />pad and footings for the new pavilion, which will be delivered and installed in approximately <br />four weeks. Work along the McClung Drive ditch has begun, including the construction of a <br />new wooden skimmer adjacent to a pond outlet. The entire project should be substantially <br />completed within one week, with the exception of the park shelter installation. <br /> <br />As part of the ditch maintenance project, the contractor was able to perform some emergency <br />work which had been discovered as part of a culvert replacement. The culvert had eroded <br />substantially since last spring and the contractor was able to expand the scope of work to include <br />this replacement. <br /> <br />Mr. Brown advised that the City Engineer recommends approval of pay request # I in the amount <br />of $94,405.68 to Nadeau Utility, Inc. A retainage of 5 percent was being held for the project. <br /> <br />. <br /> <br />Councilmember Malone asked if the paperwork for the land transfer at Arden Manor Mobile <br />Home Park had been completed. Mr. Post stated that Mr. Husnik was having difficulties finding <br />the abstract for the title. City staff had contacted Attorney Filla and was informed that there were <br />other ways to reconstruct the abstract. The cost to prepare this secondary document will be the <br />responsibility of Mr. Husnik. Councilmember Malone stated that he wanted to ensure that this <br />issue was not forgotten. <br />
The URL can be used to link to this page
Your browser does not support the video tag.