Laserfiche WebLink
<br />I <br />I <br />. <br />I <br />I <br />I No. <br />t 1 <br />2 <br /> 3 <br />I 4 <br />5 <br />I 6 <br />7 <br /> 8 <br />I 9 <br />10 <br /> 11 <br />Ie 12 <br /> 13 <br />I 14 <br />15 <br />16 <br />I 17 <br />18 <br />I <br />I <br />I <br />I <br />II <br />. <br />t <br />I <br /> <br /> City of Arden Hills <br /> 2000 Street Reconstruction Program <br /> CARLTON DRIVE CONSTRUCTION <br /> (BASED ON 32' F-F) <br /> Unit <br /> Item Unit Ouantitv Price Extension <br />Mobilization LS 1.0 $ 10,900.00 $ 10,900.00 <br />Bituminous Pavement Removal SY 5,120.0 $ 2.00 $ 10,200.00 <br />Miscellaneous Removals LS 0.2 $ 20,000.00 $ 4,000.00 <br />Common Excavation CY 4,324.0 $ 6.50 $ 28,100.00 <br />Select Granular Base (12") CY 2,162.0 $ 12.00 $ 25,900.00 <br />Aggregate Base CL 5 (8") CY 1,441.0 $ 20.00 $ 28,800.00 <br />Bituminous Base Course (2") TON 628.0 $ 30.00 $ 18,800.00 <br />Bituminous Wear Course (2") TON 628.0 $ 32.00 $ 20,100.00 <br />Bituminous Material for Tack Coat GAL 273.0 $ 1.90 $ 500.00 <br />Concrete Curb and Gutter (B618) LF 3,070.0 $ 8.00 $ 24,600.00 <br />Traffic Control LS 0.2 $ 25,000.00 $ 5,000.00 <br />Sign age SF 36.0 $ 30.00 $ 1,100.00 <br />Sodding SY 5,150.0 $ 3.00 $ 15,500.00 <br />Driveway Removal SY 623.0 $ 5.00 $ 3,100.00 <br />Bituminous Pavement (Driveway) SY 213.0 $ 25.00 $ 5,300.00 <br />Concrete Pavement (Driveway) SY 620.0 $ 40.00 $ 24,800.00 <br />Sawing Concrete Pavement LF 246.0 $ 5.00 $ 1,200.00 <br />Sawing Bituminous Pavement LF 128.0 $ 2.00 $ 300.00 <br />10% Contingency $ 22,800.00 <br />SUBTOTAL $ 251,000.00 <br />26% Indirect Cost and Capitalized Interest $ 65,300.00 <br /> <br />Total Estimated Project Cost - <br /> <br />$ 316,300.00 <br />