Laserfiche WebLink
<br />I <br />I. <br />I <br />I <br />I No. <br />I I <br /> 2 <br />I 3 <br />4 <br />j 5 <br />6 <br />7 <br />I 8 <br />9 <br /> 10 <br />I.:~ <br /> 13 <br />I 14 <br />15 <br />I 16 <br />17 <br />I <br />j <br />I <br />I <br />I. <br />I <br />I <br /> <br /> City of Arden Hills <br /> 2000 Street Reconstruction Program <br /> HAMLlNE A VENUE CONSTRUCTION <br /> (HAMLlNE AVE TO INGERSON RD) <br /> (BASED ON 32' F-F) <br /> Unit <br /> Item Unit Ouantitv Price Extension <br />Mobilization LS 1.0 $ 13,100.00 $ 13,100.00 <br />Bituminous Pavement Removal SY 4,384.0 $ 2.00 $ 8,800.00 <br />Miscellaneous Removals LS 0.2 $ 20,000.00 $ 4,000.00 <br />Common Excavation CY 5,400.0 $ 6.50 $ 35,100.00 <br />Select Granular Base (12") CY 2,314.0 $ 12.00 $ 27,800.00 <br />Aggregate Base CL 5 (12") CY 2,314.0 $ 20.00 $ 46,300.00 <br />Bituminous Base Course (2") TON 675.0 $ 30.00 $ 20,300.00 <br />Bituminous Wear Course (2") TON 675.0 $ 32.00 $ 21,600.00 <br />Bituminous Material for Tack Coat GAL 295.0 $ 1.90 $ 600.00 <br />Concrete Curb and Gutter (B618) LF 3,300.0 $ 8.00 $ 26,400.00 <br />Traffic Control LS 0.2 $ 25,000.00 $ 5,000.00 <br />Signage SF 90.0 $ 30.00 $ 2,700.00 <br />Sodding SY 7,350.0 $ 3.00 $ 22,100.00 <br />Driveway Removal SY 437.0 $ 5.00 $ 2,200.00 <br />Bituminous Pavement (Driveway) SY 437.0 $ 25.00 $ 10,900.00 <br />Concrete Pavement (Driveway) SY 80.0 $ 40.00 $ 3,200.00 <br />Sawing Bituminous Pavement LF 164.0 $ 2.00 $ 300.00 <br />10% Contingency $ 25,000.00 <br />SUBTOTAL $ 275,400.00 <br />26% Indirect Cost and Capitalized Interest $ 71,600.00 <br /> <br />Total Estimated Project Cost - <br /> <br />$ 347,000.00 <br />