Laserfiche WebLink
<br />I <br />I. City of Arden Hills <br /> 2000 Street Reconstruction Program <br />I <br /> FERNWOOD STREET CONSTRUCTION <br />I (BASED ON 32' F -F) <br />I Unit <br />No. Item Unit Quantitv Price Extension <br />I I Mobilization LS 1.0 $ 2,200.00 $ 2,200.00 <br />2 Bituminous Pavement Removal SY 1,050.0 $ 2.00 $ 2,100.00 <br />I 3 Miscellaneous Removals LS 0.1 $ 20,000.00 $ 2,000.00 <br />4 Common Excavation CY 887.0 $ 6.50 $ 5,800.00 <br /> 5 Select Granular Base (12") CY 443.0 $ 12.00 $ 5,300.00 <br />I 6 Aggregate Base CL 5 (8") CY 296.0 $ 14.00 $ 4,100.00 <br />7 Bituminous Base Course (2") TON 129.0 $ 30.00 $ 3,900.00 <br /> 8 Bituminous Wear Course (2") TON 129.0 $ 32.00 $ 4,100.00 <br />I 9 Bituminous Material for Tack Coat GAL 56.0 $ 1.90 $ 100.00 <br />10 Concrete Curb and Gutter (B6l8) LF 640.0 $ 8.00 $ 5,100.00 <br />Ie 11 Traffic Control LS 0.1 $ 25,000.00 $ 2,500.00 <br />12 Signage SF 18.0 $ 30.00 $ 500.00 <br /> 13 Sodding SY 1,410.0 $ 3.00 $ 4,200.00 <br />I 14 Driveway Removal SY 68.0 $ 5.00 $ 300.00 <br />15 Bituminous Pavement (Driveway) SY 40.0 $ 25.00 $ 1,000.00 <br /> 16 Concrete Pavement (Driveway) SY 58.0 $ 40.00 $ 2,300.00 <br />I 17 Sawing Concrete Pavement LF 10.0 $ 5.00 $ 100.00 <br />18 Sawing Bituminous Pavement LF 24.0 $ 2.00 $ 100.00 <br />I 10% Contingency $ 4,600.00 <br />I SUBTOTAL $ 50,300.00 <br /> 26% Indirect Cost and Capitalized Interest $ 13,100.00 <br />I <br />I Total Estimated Project Cost - $ 63,400.00 <br />I. <br />I <br />I <br />