Laserfiche WebLink
<br />I <br />I. City of Arden Hills <br /> 2000 Street Reconstruction Program <br />I <br /> FERNWOOD COURT CONSTRUCTION <br />I (BASED ON 32' F -F) <br />I Unit <br />No. Item Unit Ouantitv Price Extension <br />I 1 Mobilization LS 1.00 $ 2,200.00 $ 2,200.00 <br />2 Bituminous Pavement Removal SY 950.00 $ 2.00 $ 1,900.00 <br /> 3 Miscellaneous Removals LS 0.05 $ 20,000.00 $ 1,000.00 <br />I 4 Common Excavation CY 844.00 $ 6.50 $ 5,500.00 <br /> 5 Select Granular Base (12") CY 457.00 $ 12.00 $ 5,500.00 <br />I 6 Aggregate Base CL 5 (8") CY 304.00 $ 20.00 $ 6,100.00 <br />7 Bituminous Base Course (2") TON 122.00 $ 30.00 $ 3,700.00 <br /> 8 Bituminous Wear Course (2") TON 122.00 $ 32.00 $ 3,900.00 <br />I 9 Bituminous Material for Tack Coat GAL 53.00 $ 1.90 $ 100.00 <br />10 Concrete Curb and Gutter (B612) LF 655.00 $ 6.00 $ 3,900.00 <br />I.:~ Traffic Control LS 0.05 $ 25,000.00 $ 1,300.00 <br />Signage SF 9.00 $ 30.00 $ 300.00 <br /> 13 Sodding SY 1,615.00 $ 3.00 $ 4,800.00 <br />I 14 Driveway Removal SY 95.00 $ 5.00 $ 500.00 <br />15 Bituminous Pavement (Driveway) SY 134.00 $ 25.00 $ 3,400.00 <br /> 16 Concrete Pavement (Driveway) SY 30.00 $ 40.00 $ 1,200.00 <br />I 17 Sawing Bituminous Pavement LF 32.00 $ 2.00 $ 100.00 <br />I 10% Contingency $ 4,500.00 <br /> SUBTOTAL $ 49,900.00 <br />. 26% Indirect Cost and Capitalized Interest $ 13,000.00 <br />I Total Estimated Project Cost. $ 62,900.00 <br />I <br />I. <br />I <br />I <br /> ------- <br />