Laserfiche WebLink
<br />I <br />I. City of Arden Hills <br />I 2000 Street Reconstruction Program <br /> CANNON A VENUE CONSTRUCTION <br />I (BASED ON 32' F-F) <br />I Unit <br />No. Item Unit Ouantitv Price Extension <br />I 1 Mobilization LS 1.0 $ 5,200.00 $ 5,200.00 <br />2 Bituminous Pavement Removal SY 2,528.0 $ 2.00 $ 5,100.00 <br /> 3 Miscellaneous Removals LS 0.1 $ 20,000.00 $ 2,000.00 <br />I 4 Common Excavation CY 2,339.0 $ 6.50 $ 15,200.00 <br />5 Select Granular Base (12") CY 1,170.0 $ 12.00 $ 14,000.00 <br />I 6 Aggregate Base CL 5 (8") CY 780.0 $ 20.00 $ 15,600.00 <br />7 Bituminous Base Course (2") TON 340.0 $ 30.00 $ 10,200.00 <br /> 8 Bituminous Wear Course (2") TON 340.0 $ 32.00 $ 10,900.00 <br />I 9 Bituminous Material for Tack Coat GAL 148.0 $ 1.90 $ 300.00 <br />10 Concrete Curb and Gutter (B618) LF 1,650.0 $ 8.00 $ 13,200.00 <br /> 11 Traffic Control LS 0.10 $ 25,000.00 $ 2,500.00 <br />,. 12 Signage SF 18.0 $ 30.00 $ 500.00 <br />13 Sodding SY 2,123.0 $ 3.00 $ 6,400.00 <br />I 14 Driveway Removal SY 156.0 $ 5.00 $ 800.00 <br />15 Bituminous Pavement (Driveway) SY 130.0 $ 25.00 $ 3,300.00 <br /> 16 Concrete Pavement (Driveway) SY 86.0 $ 40.00 $ 3,400.00 <br />I 17 Sawing Concrete Pavement LF 18.0 $ 5.00 $ 100.00 <br />18 Sawing Bituminous Pavement LF 90.0 $ 2.00 $ 200.00 <br />I 10% Contingency $ 10,900.00 <br />I SUBTOTAL $ 119,800.00 <br /> 26% Indirect Cost and Capitalized Interest $ 31,100.00 <br />I <br /> Total Estimated Project Cost - $ 150,900.00 <br />I <br />I. <br />I <br />I <br />