My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 04-17-2000
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2000
>
CCP 04-17-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:00 PM
Creation date
11/13/2006 1:24:00 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- <br /> <br />4) Water Management Plan <br /> <br />4)Recommendation: <br /> <br />A comprehensive Water Management Plan is already a mandated item <br />by the Metro Council and related Federal and State legislation. In addi- <br />tion to the legally mandated requirements of this planning process: AH <br />should establish a procedure for cost to benefit analysis of specific Best <br />Management Practices related to city, commercial and residential <br />projects. Establish other procedures and policies as are appropriate to <br />meet and exceed RCWD standards. <br /> <br />Methodlimplementation: <br />Use a citizen task force to develop the framework and components of the <br />plan. Use consulting engineers for review and final product creation of <br />plan document. Provide specific process instructions and a correspond- <br />ing budget to the Task force to use in developing basic resources for the <br />plan in cooperation with City goals. <br /> <br />- <br /> <br />Costs/Resources: Consultant cost for plans could range from $5,000 to <br />$45,000 or more. A citizen-facilitated plan could cost substantially less <br />largely due to the minimizing of consultant fees. <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.