Laserfiche WebLink
<br />Beacon Construction, Inc. <br /> <br />e <br /> <br />November 19,2001 <br /> <br />Mr, Aaron Parrish <br />City Planner <br />City of Arden Bills <br />1245 West Highway 96 <br />Arden Hills, MN <br /> <br />RE: Arden Hills Housing <br /> <br />Dear Aaron: <br /> <br />e <br /> <br />In our continuing efforts to respond to the requests of the mayor to "consider all options" for <br />siting the building, we submit the enclosed variations along with the following commentary on <br />the plusses and minuses of each respective variation. <br /> <br />OPTION 1: Leave existing plan "s submitted <br /> <br />Plusses: <br /> <br />Meets all setback requirements (no variances needed) <br />Includes parking spaces as requested by staff for student housing use. <br />No delays and expense of redrawing. <br /> <br />Minuses: <br /> <br />Concern about extent oftrcc removal on nOlth and east sides <br /> <br />OPTION 2: Relocate north parking spaces to thc west and move buildi.ng southeast <br /> <br />Plusses: <br /> <br />Requires fewer trees to be removed on north and northeast sides. <br />Provides most parking spaces at 97 (in exc,ess of 3:1) <br /> <br />Minuses: <br /> <br />Requires variance for 20' building setback from east property line. <br />May result in more specimen trees being taken on east side, <br />Requires "working around~\ lift station. <br /> <br />tit <br /> <br />P.O. Box 174 Loretto, MN 55357 Phone and FAX: (763) 479-3836 <br />