Laserfiche WebLink
<br />~Lt-- <br /> <br />. <br /> <br /> Tentative Noise Wall Construction Projects For 2000 <br /> Route Location Terminus Terminus Length Approximate <br /> From To Cost <br /> , <br />TH 100 East Side 41st Avenue 44th Avenue 0.5 Miles $500,000 <br />Interstate 35W East Side TH96 RR Bridge 0.4 Miles $4QO,OOO <br />TH47 West Side 44th Street Interstate 694 0.6 Miles $600,000 <br /> <br />. <br /> <br />Tentative Noise Wall Construction Projects For 2001 <br />Route Location Terminus Terminus Length Approximate <br /> From To Cost <br />Interstate 94 North Side SI. Albans Victoria 0.5 Miles $500,000 <br />Interstate 94 South Side Milton SI. Albans 0.6 Miles $600,000 <br /> <br />Based on the noise analysis that was conducted, the following next steps have been <br />identified: <br /> <br />1. <br /> <br />MnlDOT will move ahead with preliminary design and final design studies to <br />ensure that proposed noise wall construction in the seven priority areas is <br />feasible, reasonable and cost effective. <br /> <br />2. <br /> <br />MnlDOT will begin working with municipalities, residents and area transportation <br />partners in the seven priority areas, where noise wall construction is proposed, <br />to assess the public's acceptance of noise walls. <br /> <br />. <br /> <br />10 <br /> <br />