Laserfiche WebLink
<br />...., <br />. <br /> <br />. . <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />Mr. Joe Lynch <br />Pebruary 9,2001 <br />Page 3 of 3 <br /> <br />Sllmmal;Y of Current Fee Reml~.s <br /> <br />At this time we are requesting the lollowing lees and lee adjustments: <br /> <br />1. Rebid Pee <br /> <br />2. Additional Construction Administration Pee <br /> <br />$8.125 <br />$14,164 <br /> <br />Potential Additional Pee Reouests <br />As you are aware, there have been many proposed scope chaoges to the project since bids were taken. These <br />changes include the potential inclusion of an ollice lor the National Guard, a server room, change 01 room <br />finishes in the community room. modificatioos to the lront counter, and the potential enclosure of an olfice <br />space on second floor. Whereas these scope change do not appear to be major items, they do take time to <br />design, administer, meet about. issue proposal requests to the contractor. etc. It is not the practice of <br />Architectural Alliance to "nickel and dime" our clients for incidental client requested scope changes which <br />are made during the course 01 a coostruction process. However, we must respect the potential requests Irom <br />our consultants lor scope changes and willlolWard those to you as we go through the process. [have also <br />requested of our staff that they keep track of the time associated with these scope changes, because the time <br />equates to lee that we can not bill lor, and, thus, provides added value lor the City. <br /> <br />We very much appreciate your consideration in this matter. Please call me if you have any questions. <br /> <br />Thank You! <br /> <br /> <br />PETER VESTERHOLT, AlA <br />Principal <br /> <br />cc: Ellsworth <br /> Elliott <br /> Sterner <br /> Cooper <br /> Dowell <br /> File <br /> <br />H;IHQ PROJECl'S119971 199714910ffice \02090 lL l,DOC <br />