My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-26-2001
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2001
>
CCP 02-26-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:32 PM
Creation date
11/13/2006 2:36:10 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />...., <br />. <br /> <br />. . <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />Mr. Joe Lynch <br />Pebruary 9,2001 <br />Page 3 of 3 <br /> <br />Sllmmal;Y of Current Fee Reml~.s <br /> <br />At this time we are requesting the lollowing lees and lee adjustments: <br /> <br />1. Rebid Pee <br /> <br />2. Additional Construction Administration Pee <br /> <br />$8.125 <br />$14,164 <br /> <br />Potential Additional Pee Reouests <br />As you are aware, there have been many proposed scope chaoges to the project since bids were taken. These <br />changes include the potential inclusion of an ollice lor the National Guard, a server room, change 01 room <br />finishes in the community room. modificatioos to the lront counter, and the potential enclosure of an olfice <br />space on second floor. Whereas these scope change do not appear to be major items, they do take time to <br />design, administer, meet about. issue proposal requests to the contractor. etc. It is not the practice of <br />Architectural Alliance to "nickel and dime" our clients for incidental client requested scope changes which <br />are made during the course 01 a coostruction process. However, we must respect the potential requests Irom <br />our consultants lor scope changes and willlolWard those to you as we go through the process. [have also <br />requested of our staff that they keep track of the time associated with these scope changes, because the time <br />equates to lee that we can not bill lor, and, thus, provides added value lor the City. <br /> <br />We very much appreciate your consideration in this matter. Please call me if you have any questions. <br /> <br />Thank You! <br /> <br /> <br />PETER VESTERHOLT, AlA <br />Principal <br /> <br />cc: Ellsworth <br /> Elliott <br /> Sterner <br /> Cooper <br /> Dowell <br /> File <br /> <br />H;IHQ PROJECl'S119971 199714910ffice \02090 lL l,DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.