Laserfiche WebLink
<br />I <br /> <br />~ <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />It <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />, <br />I <br /> <br />No. <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br /> <br />City of Arden Hills <br />2003 Street Reconstruction Program <br /> <br />PLEASANT CIRCLE <br />MILL AND OVERLAY, 641 FEET <br /> <br /> Unit <br />Item Unit Ouantitv Price Extension <br />Mobilization LS 1.0 $ 1,300,00 $ 1,300,00 <br />Mill Bituminous Surface, 2" SY 1,275.0 $ 1.50 $ 1,900.00 <br />2" Bituminous Overlay SY 3,178.0 $ 6,00 $ 19,100.00 <br />Bituminous Spot Repair SY 65,0 $ 20.00 $ 1,300,00 <br />Spot Curb and Gutter Repair LF 70,0 $ 25,00 $ 1,800,00 <br />Traffic Control LS 0,05 $ 25,000,00 $ 1,300,00 <br />10% Contingency $ 2,700,00 <br />SUBTOTAL $ 29,400.00 <br />26% Indirect Cost and Capitalized Interest $ 7,600.00 <br /> <br />Total Estimated Project Cost" <br /> <br />$ <br /> <br />37,000.00 <br />