My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-19-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 08-19-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:17:20 PM
Creation date
11/13/2006 4:05:13 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />e. <br /> <br />Coordinate financial arrangements and insurance liability to <br />maximize financing feasibility for redevelopment. <br /> <br />2. City Oblil!:ations. City shall provide Developer with environmental <br />data which City has for the TCA~ ^.P SiteAH Redevelonment Area <br />or which may be developed as part of the preparation of the City's <br />Comprehensive Plan Amendment and Infrastructure Plan. <br /> <br />C. Preparation of Land Use and Infrastructure Plan. <br /> <br />1. Developer Oblil!:ations. Developer shall accomplish the following <br />tasks: <br /> <br />a. Collect and analyze site data including: <br /> <br />(1) Reyie',y of OR baseTCAAP Site information sources to <br />identify existing conditions. <br /> <br />(2) <br /> <br />Perf-orm bBuilding inspection, and infrastructure <br />systems surveys. including location. verification, <br />inventory, and TCAAP Site condition evaluation~. <br /> <br />(3) Eyaluate the rResearch and field investigation results <br />to identify system conditions, capacities and <br />constraining elements of infrastructure as well as <br />possible opportunities for expanded service. <br />b. Review and Comment. Review and comment on drafts of <br />the City's Comprehensive Plan Amendment and <br />Infrastructure Plans as well as the City's economic impact <br />study relative to possible infrastructure financing. <br /> <br />2. City Oblil!:ations. The City shall accomplish the following tasks: <br /> <br />a. Planninl!: Consultant. City shall prepare an RFQ and retain a <br />planning consultant who shall prepare a Comprehensive Plan <br />Amendment and Infrastructure Plan for the TCAf.P SiteAH <br />Redevelonment Area to include the following elements: <br /> <br />(1) Zoning Ordinance, Design Guidelines, and related <br />regulatory changes to ensure implementation of the <br />Comprehensive Plan Amendment. <br /> <br />(2) <br /> <br />Transportation analysis and study. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.