My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-30-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 09-30-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:17:27 PM
Creation date
11/13/2006 4:05:58 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Tables 15 and 16 compares 2020 No-Build and Build intersection analysis. The <br />2020 Build conditions show that intersection operations will improve over the <br />2020 No-Build conditions at the intersection of Lexington AvenuelGuidant Drive North <br />during the A.M. and P ,M. peak due to the installation of a signal. However, even with the <br />installation of a signal this intersection will experience a LOS E in the A.M. peak Build <br />conditions as a result of the heavy left turns into the site. The rest of the intersections <br />analyzed are anticipated to have similar or worse LOS in the Build conditions than the No- <br />Build conditions due to increased traffic generated by the site. <br /> <br />TABLE 15 <br />FUTURE 2020 A.M. AND P.M. PEAK HOUR CAPACITY ANALYSIS <br />LOS RESULTS - SIGNALIZED INTERSECTIONS <br /> <br />Signalized Intersection No-Build (2020) Build (2020) <br />A.M. P.M. A.M. P.M. <br />Lexington Avenue & Guidant Drive North - - E B <br />Lexington Avenue & CR F D C F F <br />Hamline Avenue & CR F - . <br />Lexington Avenue & Victoria Street A B A A <br />Lexington Avenue & WB 1-694 Ramps C E D F <br />Lexington Avenue & EB 1-694 C F D F <br />Lexington A venue & CR 96 F F F F <br />Hamline Avenue & CR 96 F F F F <br /> <br />TABLE 16 <br />FUTURE 2020 A.M. AND P.M. PEAK HOUR CAPACITY ANALYSIS <br />LOS RESULTS - UNSIGNALlZED INTERSECTIONS <br /> <br />U nsignalized Intersection * No-Build (2020) Build (2020) <br /> A.M. P.M. A.M. P.M. <br />Lexington Avenue & Guidant Drive North F F - - <br />Hamline Avenue & CR F F F F F <br />Lexington & Guidant Drive South E F F F <br />Fernwood Avenue & CR F C D E F <br />East Drive & CR F C D F F <br />West Drive & CR F B B D D <br />Hamline A venue & West Floral Drive F F F F <br /> <br />*Note: Unsignalized Level of Service shows the worse LOS for the stopped movement. <br /> <br />Guidant Campus Master Plan <br />Draft AUAR <br /> <br />- 39- <br /> <br />September 2002 <br /> <br />. <br /> <br />. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.