Laserfiche WebLink
<br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />- <br />I <br />I <br />I <br />I <br />I <br />I <br />I. <br />I <br />I <br /> <br />The scope of the Master Plan is based on Guidant's growth over the next 18 years. <br />Guidant plans to have a net increase of 4,000 employees on the 92.7-acre site currently <br />used for office/limited industrial uses. The total development will include six new office <br />buildings, two additions to current buildings and the use of the recently acquired Building <br />o (refer to the project description in Item 6 for more detail). The proposed development <br />will add 1,029,000 square feet of office/limited industrial space to the existing <br />1,158,893 square foot of office/limited industrial uses for a total of 2,187,893 square feet <br />of office/limited industrial. To accommodate the additional parking demand on the <br />campus, seven new parking ramps will be constructed and will provide 7,027 parking <br />spaces. The proposed development will also include 615 surface parking spaces. The <br />proposed parking spaces will replace the existing 3,331 surface parking spaces, resulting in <br />a net increase of 4,311 parking spaces. <br /> <br />The buildings and parking ramps proposed in the Master Plan will range in height <br />from 30 to 135 feet above grade. Parking ramps on the campus have been designed to <br />accommodate parking levels below grade to the extent feasible, thereby reducing the <br />overall height of the ramps and further minimizing the visual impact to adjacent residents. <br />Ramps 3 and 4 in the northwest portion of the site will be constructed with one and two <br />levels below grade, respectively. Ramps 5, 6 and 7 will be constructed with two levels <br />below grade and Ramps I and 2 will be constructed with half a level below grade. <br />Table 2 identifies the height of the existing and proposed buildings and ramps. <br /> <br />TABLE 2 <br />BUILDING AND PARKING RAMP HEIGHTS (EXISTING AND PROPOSED) <br /> <br />Building/ Existinl! (feet) Pro Dosed (feet) <br /> Height Height Height Height <br />Parking Number of Stories <br />Ramp from Above Sea from Above <br /> Grade Level Grade Sea Level <br />Building A 3 57 1037 <br />Building B 3 42 1034 <br />Building C 3 42 1034 <br />Building D 3 25 995 <br />Building E 3 30 1005 <br />Building F 3 46 1032 <br />Building G 3 60(1) 1023 <br />Building H 3 60(1) 1025 <br />Building I 2 30 1005 <br />Building J 2 30 1005 <br />Building K 8 135(1) ll05 <br /> -- 6zi') <br />Building L 3 1036 <br />Building M 4 75(1) l059 <br />Building N 4 75(1) 1065 <br /> <br />Guidant Campus Master Plan <br />Final AUAR and Mitigation Plan <br /> <br />-7 - <br /> <br />January 2003 <br />