Laserfiche WebLink
<br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />.. <br />I <br /> <br />City of Arden Hills for each stage of development, the recommended traffic improvements must <br />be implemented. Guidant has also committed to updating the July 2002 traffic study prior to <br />Phases II and m. A description of the requirements for each stage of development is detailed <br />below. <br /> <br />Phase I (Years 2003-2006) <br /> <br />Prior to receiving final City of Arden Hill's approval for Phase I of the development, Guidant <br />will complete the following traffic improvements. Roadway jurisdiction is indicated in <br />parentheses following each improvement. <br /> <br />. Reconstruction of Guidant Drive North (future Cummings Park Drive) from a two-lane <br />roadway to a four-lane roadway, a llO-foot diameter cul-de-sac at the west end of the <br />roadway, a three-way stop sign at the Fair Isaacs driveway entrance, two dedicated left-turn <br />lanes from eastbound Guidant Drive North to northbound Lexington Avenue and one <br />dedicated right-turn lane from Guidant Drive North to southbound Lexington Avenue. The <br />roadway will be constructed consistent with and inspected according to City standards. (City <br />of Arden Hills) <br /> <br />. Installation of a traffic signal at Guidant Drive North and Lexington A venue. The signal will <br />be designed according to Ramscy County standards and subject to County approval. <br />(Ramsey County) <br /> <br />In addition to the roadway improvements planned by Guidant, Ramsey County also has traffic <br />improvements planned for adjacent roadways during the Phase I timeframe. These <br />improvements are idcntified in the County's 2003-2004 Capital Improvement Plan and inelude: <br /> <br />. <br /> <br />Reconstruction of Lexington Avenue from Guidant Drive North to CR 96, including the <br />construction of an additional northbound lane from Guidant Drive Nortb to CR 96. <br /> <br />. <br /> <br />A traffic signal will be installed at Victoria Street/Lexington A venue. Once the signal is <br />installed at Victoria Street, the signals at Victoria Street and Guidant Drive North will be <br />synchronized. <br /> <br />Following the construction of the Phase I development and traffic improvements, and prior to <br />Phase II development, Guidant will update the July 2002 traffic study to vcrify that the results of <br />the study are still valid. The results of the traffic study update will be utilized to update the <br />traffic improvemcnt plans for Phases II and III. <br /> <br />Phase II (201O-20l4) <br /> <br />Before Guidant can receive final City of Arden Hill's approval for Phase II of the devejopment, <br />the following traffic improvements will be completed. Roadway jurisdiction is indicated in <br />parentheses following each improvement. <br /> <br />Guidant Campus Master Plan <br />Final Mitigation Plan <br /> <br />- 8- <br /> <br />January 2003 <br />