My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-09-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 06-09-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:18:27 PM
Creation date
11/14/2006 2:36:08 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />that City maintenance staff will periodically inspect the weir and outlet pipes in . <br />the basin (1-2 times per year) and remove silt deposits from the basin as they <br />accumulate. The silt will be removed by a truck parked on Ingerson Road or <br />Fernwood Court with an extended "vacuum" hose. A long arm type of backhoe is <br />also commonly used for silt removal. At the City's expense, the City will make <br />any repairs, maintenance and/or replacement to the basin edge and/or the weir in <br />the future. <br />. In consideration of all easements, the City shall pay the Association $4,125 within <br />thirty (30) days of completion of the project. <br />. Neither the temporary nor the permanent maintenance easements allows the City to <br />construct improvements unrelated to utility or drainage purposes such as trails, roads, <br />etc. If the City disturbs the property surface of the Association's property as a part of <br />its maintenance activities, at the City's expense, the City will restore the property <br />surface and surrounding area to its original condition - i.e. sod, seed, plants etc. The <br />final exact footage of the easement will not exceed the maximum 300 square feet for <br />the Utility Easement and/or the 5200 square feet for the Drainage Easement for a total <br />of 5500 square feet maximum. <br />. The City will prepare the necessary detailed temporary and permanent easement <br />documents including legal descriptions and terms of the easements at no cost to the <br />Association. <br /> <br />JOSEPlliNE HILLS ASSOCIATION <br /> <br />CITY OF ARDEN HILLS <br /> <br />. <br /> <br />- <br />Marjorie A. Alexander <br />President/Chair of the Association <br />Date: , 2003 <br /> <br />Aaron Pam sh <br />Interim City Administrator <br />Date: <br /> <br />,2003 <br /> <br />Beverly Aplikowski <br />Mayor of Arden Hills <br />Date: <br /> <br />,2003 <br /> <br />. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.