My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-29-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 09-29-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2008 2:15:37 PM
Creation date
11/14/2006 2:37:24 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />'. <br /> <br />" <br /> <br />(-) <br /> <br />(') <br /> <br />Planned Unit Develo ment Amendment <br />Ex ansion of Build in D <br />Parkin Lot Ex ansion <br />Fence Variance <br />Ex ansion ofBuildin V <br />Planned Unit Develo ment <br />Si setback variance - COUll Road F <br />Si setback variance - Femwood Avenue <br />81-36 Additional Access Drive <br />79-12 Phase ill buildin - Buildin A <br />78-22 Si variance - Hamline Avenue <br />76-39 Phase II Construction - Buildin B <br />75-20 Phase I Construction - Buildin C <br />(A) Approved (D) Denied <br /> <br /> <br />97-03 <br />94-17 <br />91-08 <br />91-06 <br />89-22 <br />89-10 <br />82-23 <br /> <br />Master PUD Amendment & Site Plan Review (Parkin!! Ramp) <br />The proposed parking ramp is a freestanding structure with an adjoining stair tower and <br />stair elevator tower of 5 levels, The lowest level would be below grade with four above <br />grade, The structure is located on an existing surface parking lot and covers 52,635 <br />square feel, <br /> <br />The Zoning Ordinance does not define a parking structure or ramp. However, there are <br />specific requirements for off-street parking areas that will be used to evalnate this <br />proposal. A parking ramp can not be considered a principal structure (conducting a <br />principal use) on the campus and should not be evaluated as such. As a structure, it is <br />accessory to the principal structures on the property, <br /> <br />1. Access. Access to the parking ramp is provided off of County Road F and Hamline <br />Avenue, through a parking lot <br /> <br />2. Circulation. Circulation through the campus is provided by a series of defined <br />drives which link the various buildings and parking areas of the campus to Harnline <br />A venue, County Road F, and Femwood Avenue, <br /> <br />The proposed parking ramp is located between two parking areas, not disruptive of <br />pedestrian or vehicular circulation on the site, The location of the parking ramp is <br />on an existing parking area, a little larger in footprint than it currently exists, <br /> <br />3. <br /> <br />Parking. Each parking level contains approximately 51,300 gross square footage of <br />parking space. The new parking structure would create 615 parking spaces, while <br />displacing 92 parking spaces from the surface lot existing on the proposed site <br />today, This would be a net gain of 523 parking spaces, The last Master PUD <br />amendment for Guidant stated that the campus had a total of 1,405 existing parking <br />spaces, The site was required to have a total of 1,912 parking spaces for future <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.