Laserfiche WebLink
<br />I <br /> <br />.. <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br />.. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />.. <br />I <br /> <br />I <br /> <br />City of Arden Hills <br />2004 PMP <br /> <br />Edgewaler Avenue (West End) - Roadway Quantities <br />Full Reconstruct (Alley Section) 215 LF <br /> <br /> CONTRACT UNIT COST PROJECT COST <br />ITEM NO. ITEM DESCRIPTION UNIT QUANTITY <br />1 MOBIUZATION LS 1 $1,18S.97 $1,186 <br />2 SAWCUT BITUMINOUS PAVEMENT(FULL DEPTH) LF 41 $4.00 $164 <br />3 SAWCUT CONC PAVEMENT LF 43 $6.00 $258 <br />4 REMOVE BITUMINOUS PAVEMENT SY 403 $2.00 $807 <br />5 REMOVE BIT DRIVEWAY SY 15 $3.00 $45 <br />6 REMOVE CONC DRIVEWAY SY 31 $3.00 $94 <br />7 REMOVE AND REPLACE MAILBOX EA 3 $50.00 $150 <br />8 COMMON EXCAVATION CY 321 $7.00 $2,247 <br />9 SELECT GRANULAR BORROW CY 148 $13.50 $1,998 <br />10 AGGREGATE BASE CLASS 5 CY 93 $21.00 $1,953 <br />11 6" CONCRETE ALLEY (16' WIDE) SY 369 $35.00 $12,927 <br />12 BIT DRIVEWAY SY 20 $25.00 $500 <br />13 CONC DRIVEWAY SY 30 $40.00 $1,200 <br />14 SILT FENCE LF 100 $2.00 $200 <br />15 REMOVE SILT FENCE LF 100 $0.50 $50 <br />16 SOD WITH 4" TOPSOIL AND FERTlUZER SY 222 $3.00 $667 <br />17 STREET CLEANING HR 1 $100.00 $100 <br />18 WATER FOR DUST CONTROL MGAL 20 $18.00 $360 <br /> ESTIMATED CONSTRUCTION COST $24,905 <br /> 10% CONTINGENCY $2,500 <br /> 26% ENGINEERING AND ADMINISTRATION $6,500 <br /> TOTAL COST $34,000 <br />