Laserfiche WebLink
<br />I <br /> <br />.. <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br />.. <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />.. <br />I <br /> <br />I <br /> <br />City of Arden Hills <br />2004PMP <br /> <br />Shoreline Lane (North of Edgewater) - Roadway Quantities <br />Full Reconstruct (Alley Section) 152 LF <br /> <br /> CONTRACT UNIT COST PROJECT COST <br />ITEM NO. ITEM DESCRIPTION UNIT QUANTITY <br />1 MOBILIZATION LS 1 $975.58 $976 <br />2 SAWCUT CONCRETE (FULL DEPTH) LF 31 $6.00 $186 <br />3 REMOVE BIT DRIVEWAY SY 68 $3.00 $203 <br />4 REMOVE GRAVEL DRIVEWAY SY 141 $1.50 $212 <br />5 COMMON EXCAVATION CY 305 $7.00 $2,135 <br />6 SELECT GRANULAR BORROW CY 141 $13.50 $1,904 <br />7 AGG REGA TE BASE CLASS 5 CY 83 $21.00 $1,743 <br />8 6" CONCRETE ALLEY (16' WIOE) SY 270 $35.00 $9,450 <br />9 BIT ORIVEW A Y SY 19 $25.00 $486 <br />10 GRAVEL DRIVEWAY SY 6 $15.00 $83 <br />11 SILT FENCE LF 100 $2.00 $200 <br />12 REMOVE SILT FENCE LF 100 $0.50 $50 <br />13 SOD WITH 4' TOPSOIL AND FERTILIZER SY 800 $3.00 $2,400 <br />14 STREET CLEANING HR 1 $100.00 $100 <br />15 WATER FOR DUST CONTROL MGAL 20 $18.00 $360 <br />16 MODULAR BLOCK RETAINING WALL SY 100 $25.00 $2,500 <br /> ESTIMATED CONSTRUCTION COST $19,152 <br /> 10% CONTINGENCY $1,900 <br /> 26% ENGINEERING AND ADMINISTRATION $5,000 <br /> TOTAL COST $26,000 <br />