Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />7. Phasing - Requires modification to include Addition UJ" in Phase 1 (2003-2006) of the <br />Phasing Schedule. <br /> <br />The phasing schedule lists Additions "J" as part of Phase 2 (2010-2015). The applicant <br />has provided a list of the amount of space and parking spaces provide for Phase I and the <br />amount of space and parking spaces which have been provided for Phase 2. The <br />applicant's list shows what was originally approved and what has been proposed (or <br />constructed) to this point. Staff has reviewed the applicant's list and provided the <br />following table to demonstrate what has been approved (through the Master Plan and <br />previous amendments) and what is currently proposed in conjunction with Phase 1 of the <br />Master Plan. It is staff's understanding that the applicant still wishes to keep Building K <br />in phase I so that has been included on staffs table to show the overall changes to Phase <br />I of the Master Plan PUD. The phasing schedule would need to be amended to reflect the <br />change from Phase 2 to Phase I. <br /> <br />Impact on Phase 1 of the Master Plan Phasing Schedule <br /> <br />Approved to date (square feet) Proposed (square feet) <br />Construction of Building L 112,000 Construction of Building L 112,000 <br />(Training Center) (Training Center) <br />Construction of Addition I 54,000 Construction of Addition I 54,000 <br />(Bldg. E - South) (Bldg. E - South) <br />Construction of Building K 259,200 Construction of Building K 259,200 <br />(Administration Building) (Administration Building) <br />_~aster Plan only - not Final Master Plan only - not Final <br />Construction of Building N 38,000 Construction of Building N 38,000 <br />Addition Addition <br /> Construction of Addition J 90,000 <br />- - (Bldg. E - North) <br />Construction of Parking 500 Spaces Construction of Parking 500 Spaces <br />Ramp 1 Ramp I <br />Construction of Parking 900 Spaces Construction of Parking 900 Spaces <br />Ramp 5 Ramp 5 <br />Total 463,200 Total 553,200 <br /> Square Feet Square Feet <br /> 1,400 1,400 <br /> Spaces Spaces <br /> <br />8. Parking - Met through proof of parking. <br /> <br />\\EaJ1h\Planning\Planning Cases\2004\04-01 Guidant Master Plan PUD Amendment and Final PUD for Addition J (PENDrNG)\02-04-o4 PC <br />Report.doc <br /> <br />Page 60f8 <br />