Laserfiche WebLink
<br />. <br /> <br />City of Arden Hills <br />2004 Assessment Policy <br /> <br />Lateral benefit may be providcd by conncction to trunk, subtrunk or latcral <br />pipcs. The calculation ofJateral benefit from a trunk or subtrunk pipe will <br />be based on the cost of an eight inch (8") pipe along the same alignment <br />for commercial or industrial zoned property and a six inch (6") pipe for all <br />other areas. <br /> <br />8. <br /> <br />Infrastructure Rebabilitation Proiects <br />Any project or portion of a project that reconstructs an eXlstmg water <br />system facility. A rehabilitation project may occur on the existing <br />alignment of the water line or on a new alignment, thus allowing the <br />existing linc to bc abandoncd or its status downgradcd (i.c., trunk or <br />sub trunk to lateral). <br /> <br />. <br /> <br />B. Determining 'Vater Main Assessment Rates <br /> <br />TEll <br />1. Trunk Subtrunk Stora e and .I1eleatment Facili Rates <br />Any lateral and building servl"~ ssments described below will be <br />deducted from the total impr ement c to be assessed. The remaining <br />costs shall be spread equa properties that lie within the approved <br />Service District. Thc cost e spread on a gross area basis and will <br />be known as all or a of thc owing as appropriatc: trunk, subtrunk, <br />sourcc, storage, and tr ssment. <br /> <br />. <br /> <br /> <br />ments described below will be deducted from <br />t cost to be assessed. The amount remaining after <br />assessed by the following method. <br /> <br />2. Water Main L <br />The building <br />the total impro <br />said dedu <br /> <br />. <br /> <br />2 residential lots at 100% ofthe total ro' ect cost <br />land uses at 100% of the total proiect cost <br /> <br />3. Water Main Building Service <br />The assessment rate for each size of building service three-quarter inch <br />(3/4") to eight inch (8") inch shall bc determincd by adding all the costs <br />associated with each sizc of scrvice and dividing by thc total number of <br />services constructcd. Each unit will be assessed at the determined rate for <br />each size and number of serviccs install cd. This will be known as the <br />building servicc asscssment. <br /> <br />. <br /> <br />2004 Assessment Policy Manual - Page] 7 <br />