My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-10-05
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2005
>
01-10-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2012 10:46:44 AM
Creation date
11/14/2006 4:22:25 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Memo <br />Scott Clark <br />City Hall Flashing repair <br />2 <br /> <br />make for a total amount of $47,111.00 by Building Restoration, and $55,568.00 by Kraus <br />Anderson to replace 210 lineal feet of through wall flashing at the base of the building. Enclosed <br />are copies of the quotes from Building Restoration and Kraus Anderson. Also for your <br />information is the summary report from Architectural Testing on the cause of the water leakage. <br />Staff has met with the league of Minnesota and filed an insurance claim for the repair of the <br />water damage. Staff is unsure if the league will pay for any of the repairs. The league did suggest <br />that the City do another water test of the repaired areas to verify the proper corrections have been <br />made. Staff has obtained a quote of $1,500.00 from Architectural Testing to retest the repaired <br />areas. <br /> <br />Request <br />Staff at this time would like to request authorization to proceed with only the repair of the <br />flashing above the council conference room. Staff recommends hiring Building restoration for <br />$10,820.00 to do the repairs. Due to the time of year, Building restoration would charge an <br />additional fee of approximately $1,000.00 to tcnt and heat the area. Staff also requests <br />authorization to have Architectural Technology retest the repaired areas for $1,500.00 <br />The remainder of the flashing would be left to do dependent upon the results of the arbitration <br />proceedings with the general contractor, Rochon Corp. <br />
The URL can be used to link to this page
Your browser does not support the video tag.