My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-10-05
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2005
>
01-10-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2012 10:46:44 AM
Creation date
11/14/2006 4:22:25 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I' <br />I <br />I <br />I <br />I <br />I <br />I <br />.. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />, <br />I <br /> <br />2005 PAVEMENT MANAGEMENT PROGRAM <br /> <br />II F. PROJECT COSTS <br /> <br />- <br /> <br />Preliminary project cost estimates have been prepared for the proposed improvements and the <br />alternatives discussed in this report for the consideration of the Council. Project costs shown <br />below include a 10% contingency cost and 26% for administrative costs. Administrative costs <br />include engineering, planning, legal, fiscal and City staff expenses. The following is a summary <br />of the estimated project costs for the recommended improvements and alternatives, Detailed <br />estimates are included in Appendix B. <br /> <br />Item Description <br /> <br />Proiect Cost <br /> <br />Roadway Improvements <br />Dunlap Street Reconstruction * <br />TH 51 Frontage Road Alternative 1 <br />TH 51 Frontage Road Alternative 2* <br />TH 51 Frontage Road Alternative 3 <br />TH 51 Frontage Road Alternative 4 <br />Red Fox Road Rehabilitation * <br />Grey Fox Road Rehabilitation* <br />Northwoods Drive Rehabilitation* <br /> <br />$319,000 <br />$381,900 <br />$430,000 <br />$327,500 <br />$100,000 <br />$231,200 <br />$198,700 <br />$47,000 <br /> <br />Drainage Improvements <br />Dunlap Street Drainage Improvements* <br />TH 51 Frontage Road Storm Sewer (Alternatives 1,2 & 3)* <br />TH 51 Frontage Road Storm Sewer (Alternative 4) <br />Red Fox Road Storm Sewer Modifications* <br /> <br />$107,800 <br />$123,100 <br />$110,000 <br />$20,100 <br /> <br />Watermain Improvements <br />Hydrant and Valve Replacement Project Area* <br /> <br />$138,600 <br /> <br />Sanitary Sewer Imorovements <br />Spot Repairs over Project Area* <br /> <br />$15,100 <br /> <br />Sidewalk Improvements <br />Grey Fox, Dunlap, Red Fox Loop Alternate <br /> <br />$85,000 <br /> <br />Total Project Cost Based Upon Improvements identified by asterisks above: $1,610,500 <br /> <br />URS <br /> <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.