Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />2006 PAVEMENT MANAGEMENT PROGRAM <br /> <br />I E. PROPOSED UTILITY IMPROVEMENTS <br /> <br />II <br /> <br />SANITARY SEWER IMPROVEMENTS <br />Proposed improvements include replacing the sanitary force main from Lift Station #3 and from <br />Lift Station #4. Due to the cOlTosi ve nature of area soils, age and material of the force main we <br />anticipate that the existing condition of the pipe is fair to poor. The forcemain will be replaced <br />with a 6" PVC or HDPE pipe. Exhibit A7 illustrates the proposed Sanitary Sewer Improvements. <br /> <br />Each sanitary manhole will be inspected during the final design phase of the project to determine <br />its condition. Manholes that appear to be structurally deficient will be included for repairs and <br />lor reconstruction. Manholes with infiltrating ground water will be identified to be sealed as a <br />part of future sanitary sewer rehabilitation work. <br /> <br />W A TERMAIN IJVIPROVE'VIENTS <br />Proposed improvements include the replacement of all hydrants and gate valves within the <br />neighborhood. Due to corrosive soils, the age of the valves and past expelience in similar soil <br />conditions the valves have often become inoperable and need to be replaced. Due to recent <br />water main breaks along Arden Place the entire segment of watermain and house services along <br />Arden Place is proposed to be replaced with high strength 8" PVC watermain. <br /> <br />Watennain Option 1: Replace All Existing Watermain The existing 6" and 8" cast iron <br />pipe and would he replaced with high strength 6" and 8" PVc. Due to the cOlTosive <br />nature of the soils and based on past experience in similar soil conditions, it is possible <br />that the cxisting watermain is nearing its useful life in several areas of the neighborhood <br />beyond the breaks recently expClienced along Arden Place. This option would provide <br />new life expectancy for the watermain within the neighborhood and reduce or eliminate <br />the likelihood of ongoing spot repairs throughout the neighborhood over the next 50 <br />years. The additional cost to replace watermain and services along Siems Court, <br />Ridgewood Road and Skiles Lane is approximately $184,000. Exhibit A8 illustrates the <br />proposed waterrnain improvements. <br /> <br />PRIVATE UTILITIES <br />Private utility companies have been notified of the extent and proposed schedule of the project. <br />They will be required to relocate any of their lltilities that conflict with City uti Iities or roadway <br />improvements proposed in the project. A meeting will be held with the private utility companies <br />to discuss the proposed project and this may result in private utility upgrades. Although ptivate <br />utility upgrades and modifications may be done in conjunction with this proposed project they <br />would not be installed as part of this proposed project. Based upon our review of the <br />neighborhood to date we do not anticipate significant private utility impacts. However if large <br />amounts of watermain are replaced, some gas lines will likely need relocation or replacement. <br /> <br />URS <br /> <br />1+ <br />