Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />2006 PAVEMENT MANAGEMENT PROGRAM <br /> <br />J F. PROJECT COSTS <br /> <br />I' <br /> <br />Preliminary project cost estimates have been prepared for the proposed improvements and the <br />alternati ves discussed in this report for the consideration of the Council. Project costs shown <br />below include a 10% contingency cost and 18% for engineering, administrative and construction <br />inspection costs. The following is a summary of the estimated project costs for the <br />recommended improvements and alternatives. Detailed estimates are included in Appendix B. <br /> <br />Item Deseription <br /> <br />Pro iect Cost <br /> <br />Roadway Bascline Improvements <br />Storm Drainage Baseline Improvements <br />'Vatermain Baseline Improvements <br />Sanitary Sewer Baseline Improvements <br />Easement Acquisition Allowance <br />Total Estimated Project Cost (excluding Options): <br /> <br />$1,100,000 <br />$410,000 <br />$160,000 <br />$ 82,000 <br />$ 12.000 <br />$1,764,000 <br /> <br />Optional Imprnvernents <br />Ridgewood Ct Reconstruction Option <br />Curb Option 1 (Exposed Aggregate) <br />Curb Option 2 (Colored Curb) <br />Ridgewood Road ROW Option 1 <br />Siems Court Wall Option 2 <br />Roundabout Option <br />Ridgewood Road Sidewalk Option <br />Watermain Option 1 <br /> <br />$120,000 <br />$ 65,000 <br />$130,000 <br />$ 15,000 <br />$ 45,000 <br />$ 32,000 <br />$ 65,000 <br />$184,000 <br /> <br />URS <br /> <br />15 <br />