Laserfiche WebLink
<br />\ <br /> <br />URS <br /> <br />. <br /> <br />August 3, 2005 <br /> <br />Ms. Michelle Wolfe <br />City Administrator <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br /> <br />RE: Work Order OS-03 <br />2006 Lift Station Rehabilitation <br /> <br />Dear Ms. Wolfe, <br /> <br />The following proposal is offered as a confirmation of our scope of work, estimated fees and schedule for the <br />above-referenced project. <br /> <br />GENERAL PROJECT SCOPE <br />The proposed scope of work includes services for preliminary engineering, preparation of final plans and <br />construction services for the proposed rehabilitation of Lift Stations # I, # II, # 12 and #13 located Ihroughout the <br />City. These four lift stations are the last remaining stations with dry well operating systems to be replaced with <br />submersible pump systems. <br /> <br />. <br /> <br />BASIC SERVICES <br /> <br />Design Phase <br />URS will provide preliminary engineering services for the proposed project including the evaluation of alternatives <br />which may be appropriate. URS will conduct field reviews ofIhe project site as necessary and prepare presentation <br />graphics and exhibits for public information and council review. URS will make modifications to the proposed <br />improvement scope as directed by City staff and Council. The preparation of a feasibility report is not included in <br />the scope of professional services. URS will prepare final plans and specifications for the project in accordance <br />with the Professional Services Agreement. City staff will provide as-built infonnation as needed for the project. <br />Final plans and specifications will be prepared to City standards and will include removal plans, utility <br />reconstruction plans, grading plans, details, and site restoration plans as necessary. Final plans and specificalions <br />will be submitted to City staff for review and comment. <br /> <br />Bidding Phase <br />URS will provide bidding phase services in accordance with the Professional Services Agreement. URS will <br />submit advertisements for bidding, produce bidding documents, answer contractor questions, issue addendums and <br />conduct the bid opening. URS will check bids and provide a detailed bid tabulation and recommendation of award <br />to City Council. <br /> <br />. <br /> <br />Thresher Squw~ . 700 Third Stlref Soufh . SIIife 600' Mi/l/leapolis, MN 55415. Pho/le: (612) .FO.0700 . Fax: (612) 370-1378 <br />