<br />2006-2010 CIP <br />2116/2006 <br />Page 3 <br /> <br />. <br /> <br />· Inflow and Infiltration 0&1) <br />City staff met with Met Council to discuss the current problem with I & 1. Based upon <br />current data and conditioos, the City could f'ICC a $500,000 surcharge with Met Council if <br />1&1 is not reduced. This charge would be paid over five years, starting in 2007, but would <br />be retrievable if the City spent any money to reduce ]&1. However, the City could "opt <br />out" of the surcharge by committing an equal or greater level or local funding, (whatever <br />amount is necessary), to implement 1&1 reduction. Staff is looking at what needs to be <br />done to avoid the surcharge and is estimating costs of the necessary improvcments. Staff <br />is also gathering infomlation from past O&M proccdurcs and projects that could be used <br />as to assist in 1&1 reduction as well. <br /> <br />Staff recommendations: Bascd upon the projected fund balance, the possibility of acquiring <br />SCADA, and the immediate need to address 1&1, staff is rccommending to delay the lift <br />station reconstroction project and reject the current bids. Once additional information is <br />gathered regarding costs associated to each of these potential projects, staff will cvaluate <br />when sufficient funds would be available to complete the lift station reconstroctlon. <br /> <br />Storm Sc.wer Fund <br />The 2006 PMP project ineludes a proposed estimate of $410,000 to be used from the Storm <br />Sewer Fund. This amount will causc the fund balancc to dip significantly below the infi)rmal . <br />balance of $500,000. However, at the end of 2009, the projccted balance is estimated to <br />recovcr to about $600,000. <br /> <br />Watermain Fund <br />If the City takes on all the CIP and PMP projects as currently listed in tbe draft worksheet, <br />the projected balance at the end of 2009 is estimated to be about $650,000. <br /> <br />PROJECT SCHEDULE 2006-2010 <br /> <br />The extent of the projects that are planned for 2006 and the remaining four years of the CIP are <br />dependent on sevcral factors, ineluding those listed below. Staff would like input from Council <br />as to whether to continuc with 2006 projects as planned and input on the other factors for future <br />projects. <br /> <br />2006 PROJECTS (excluding 2006 PMP and Lift Station Reconstruction, discussed <br />above) <br /> <br />CSAH 96 Landscaping Projcct <br />Ramsey County will be participating in thc funding of this project; the County will pay for <br />trce replacement at a 2: 1 ratio of the number removed during the reconstruction of Highway <br />96. This equates to approximately $150,000 (45%) of the total project costs. The project may <br />also be eligiblc for up to approximately $30,000 in reimbursement from MSA funds. Thc . <br />remainder of the costs (approximately SI70,000) would be paid from the General Capital <br />Fund. Staff will be meeting with the County to discuss thc cost-participation agreement, and <br />