Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Recommendation <br /> <br />The Planning Commission reviewed Planning Case #06-010 at their AprilSth, 2006, <br />meeting and recommends approval (4-1) of the Planned Unit Development Master Plan <br />(6th) Amendment and Site Plan Review. <br /> <br />Findings of Fact: <br /> <br />The Planning Commission found that the proposal met the requirements ofthe I-I: <br />Limited Industrial District. Furthermore, the Planning Commission found that the <br />proposal, with the recommended conditions, would not have a negative impact on the <br />hcalth, safety, or welfare of neighboring properties or the City of Arden Hills. <br /> <br />Recommended Conditions: <br /> <br />At the Planning Commission meeting, the Commission and Staff recommended that the <br />approval bc subject to the following eleven conditions: <br /> <br />I. The applicant shall continue to abide by the conditions of approval as stated in the <br />approved Master Plan PUD except as amended by the six subsequent amendments. <br />2. A PUD Amendment form, drafted by the City Attorney, shall amcnd the PUD and <br />encompass all five amendments to the Master Plan PUD. A building permit may only <br />be issued after the PUD Amendment document receives the approval of the City <br />Council and is executed by both the City Council and the applicant. <br />3. The project shall be completed in accordance with the plans submitted as part of the <br />master plan amendment and site plan review application. Any significant changes to <br />these plans, as determined by the City Planner, shall require review and approval by <br />the Planning Commission. <br />4. The master plan amendment and site plan review shall automatically expire and <br />become void one (I) year from and after the date on which the Council granted such <br />approval if work on the project has not begun within that time period. <br />S. The applicant shall obtain any necessary permits from Rice Crcek Watershed, the <br />Pollution Control Agency, the NPDES (National Pollution Discharge Elimination <br />System) permit, and any other necessary permits before a building permit is issued. <br />The City shall be copied with all required permits. <br />6. Any changes to the grading, erosion, or drainage plans shall be submitted to the City <br />Engineer for approval. <br />7. Erosion control measures shall be inspected by the City Engineer before constmction <br />begins. <br />8. The applicant shall comply with the following conditions recommended by the Lake <br />Johanna Fire Department: <br />a. The applicant shall install "No Parking Fire Lane" signs on the north side of <br />Guidant Drive South upon completion ofthe changes to Guidant Drive South. <br />b. The entrance from County Road F to the Arden Woods parking lot shall be <br />modified to allow fire apparatus to turn east or west into the lot. <br /> <br />\\Metro-inet.us\ardenhills\Pfanning\Plrmning Cases\2006106-01O Guidant site pial! and PUD amendment (PENDING)\041706 CC Report- <br />Guidant Variance. doc <br /> <br />Page 3 of5 <br />