Laserfiche WebLink
<br />Wanning House Status Memo <br />May 3, 2006 <br />Page30f6 <br /> <br />. Electrical Relocation: A one time fee of $3,825 for Freeway Park and a one time . <br />fee of$I,600 for Hazelnut Park (Attachment 7B-6) <br /> <br />. Tear Down: $285 plus labor for a 20-yard dumpster <br /> <br />. Rental of a mobile unit: $379.70 per month (approx. $1,139.10 per season) <br /> <br />· Delivery/set up fee: $2 10 per season <br /> <br />The estimated annual cost for this option would be $1,349.10 per site plus the <br />onc time cost of electrical relocation of $3,825 for Freeway Park and $1,600 for <br />Hazelnut Park. We would incur a $285 fee per site for a 20 yard dumpster for <br />tear down. Tear down figures do not includc labor. <br /> <br />For a specific breakdown of estimated costs for this option, please rcler to the <br />attached estimates. (Attachment 7B-7) <br /> <br />(3) OPTION C: Build a small portable building that can be stored off site during the off <br />season and brought in during the rink season. <br /> <br />This has been done for the City of St. Michael. The building was built in 1999 at a <br />cost of $5,000. Mr. Ed Haller, Pubic Works Superintendent for St. Michael, referred <br />to the building as an "oversized ice fishing house." Pictures of this option are <br />attached. (Attachment 7B-8) The building specifications is below: <br /> <br />. 16 foot wide by 20 foot long, vinyl on the outside and plywood on the inside. It . <br />has one door and two windows. <br /> <br />. St. Michael Public Works has a certified carpenter on staff that was responsible <br />for this project. It was constructed during the winter months. <br /> <br />. It has skids, in place of wheels because it can be dragged to the winter location, <br />approximately 500 feet. <br /> <br />· It is only used during ice skating season. <br /> <br />. Jt has a heater and one toilet stool. They pay BlFFS, Inc. to hook up a waste <br />water tank, similar to what exists in an outdoor toilet. <br /> <br />. lfthey had to build it again, they would make it longer and use wheels instead of <br />the skids. <br /> <br />The total estimated overall cost for this option is $8,825 for Freeway Park and <br />$6,600 at Hazelnut Park, which inclndes a one time building cost of $5,000 per <br />site plus a one time cost of $3,825 for electrical relocation at Freeway Park and <br />$1,600 at Hazelnnt Park. Wc would incur a $285 one time fee per site for a 20 <br />yard dumpster for tear down. These figures do not factor in building or tear <br />down labor costs. <br /> <br />One question that has come up with this option is: Where do we store the buildings? <br />Currently, there is no space at the Ramsey County/Arden Hills Maintenance Facility <br />to accommodate the buildings. <br /> <br />. <br />